501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

B. Wiring Method: Comply with Division 16 Section "Conductors and Cables."<br />

C. Identify components and power and control wiring according to Division 16 Section "Electrical<br />

Identification."<br />

3.2 FIELD QUALITY CONTROL<br />

A. Perform the following tests and inspections:<br />

1. Operational Test: After installing time switches and sensors, and after electrical circuitry has been<br />

energized, start units to confirm proper unit operation.<br />

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and<br />

equipment.<br />

B. Lighting control devices will be considered defective if they do not pass tests and inspections.<br />

END OF SECTION 16501<br />

LIGHTING CONTROL DEVICES 16501 - 4