04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

PART 2 - PRODUCTS<br />

2.1 DUCTLESS SPLIT SYSTEM AIR CONDITIONING UNITAND/OR HEAT PUMP UNITS<br />

A. Furnish and install a split system air conditioner utilizing outdoor condenser and indoor evaporator.<br />

Outdoor unit shall contain sufficient R-410A refrigerant to completely charge system. The<br />

condenser shall be equipped with a rotary compressor and external brass service valves and<br />

charging port. The outdoor condenser shall have a capillary tube metering device located<br />

internally. Evaporator and condenser coils shall be constructed with aluminum slit fins<br />

mechanically bonded to copper tubes. The system shall bear the ARI Certification symbol and<br />

shall be listed by ETL Testing Laboratories, Inc. Indoor unit shall be wall mounted.<br />

B. Provide microprocessor control.<br />

C. System shall be complete and shall include an integral condensate pump, shut off valves,<br />

charging valve, filter-dryer, sight glass, and expansion valve, Outdoor units to have “Seacoast<br />

Protection” option, (i.e., a “Blygold-Houston” protective coating on the outdoor unit coils).<br />

D. The system shall be single zone as indicated on the Drawings, and shall be as manufactured by<br />

Mitsubishi Electric Corp. or similar by Sanyo Electric.<br />

PART 3 - EXECUTION<br />

3.1 ROOFTOP HEAT TRANSFER EQUIPMENT<br />

A. Install new filters after start-up.<br />

B. Perform miscellaneous wiring, including communication wiring, not specifically shown on the<br />

Division 16, Electrical Drawings in order that units and field installed accessories operate in<br />

accordance with the manufacturer's intentions.<br />

G. Prepare unit for start-up to produce intended operating results. Start-up unit in accordance with<br />

manufacturer's written instructions and local gas utility requirements.<br />

END OF SECTION 15700<br />

HEAT TRANSFER EQUIPMENT 15700-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!