501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

1. Engineering Responsibility: Assumes engineering responsibility to comply with requirements in<br />

"Performance Requirements" Article by engaging a qualified professional engineer to prepare<br />

design calculations, Shop Drawings, and other structural data for piles.<br />

2. PCI Plant Certification Program: Participates in PCI's Plant Certification Program and is<br />

designated a PCI-Certified Plant for B2 and C2 product group and category, or better.<br />

B. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for<br />

installation of units required for this Project.<br />

1. Installer's responsibility includes engaging a qualified professional engineer to prepare pile-driving<br />

records.<br />

C. Testing Agency Qualifications: An independent testing agency qualified according to ASTM C 1077 and<br />

ASTM E 329 for testing indicated.<br />

D. Design Practices: Comply with ACI 318 (ACI 318M) and the recommendations in PCI Committee Report:<br />

"Recommended Practice for Design, Manufacture and Installation of Prestressed Concrete Piling."<br />

E. Quality-Control Standard: For manufacturing procedures and testing requirements, quality-control<br />

recommendations, and dimensional tolerances for piles, comply with applicable requirements in PCI MNL-<br />

116, "Manual for Quality Control for Plants and Production of Structural Precast Concrete Products."<br />

F. Comply with requirements in ACI 301, "Specifications for Structural Concrete."<br />

G. Welding Qualifications: Qualify procedures and personnel according to the following:<br />

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel"<br />

2. AWS D1.4/D1.4M, "Structural Welding Code - Reinforcing Steel."<br />

H. Preinstallation Conference: Conduct conference at Project site.<br />

1.8 DELIVERY, STORAGE, AND HANDLING<br />

A. Deliver piles to Project site in such quantities and at such times to ensure continuity of installation. Handle<br />

and store piles at Project site to prevent cracking, distorting, warping, or other physical damage, and so<br />

markings are visible.<br />

B. Lift and support piles only at designated lifting or supporting points as shown on Shop Drawings.<br />

1.9 PROJECT CONDITIONS<br />

A. Protect structures, underground utilities, and other construction from damage caused by pile driving.<br />

B. Site Information: A geotechnical report has been prepared for this Project and is included elsewhere in<br />

the Project Manual for information only.<br />

C. Preconstruction Photographs: Inventory and record the condition of adjacent structures, underground<br />

utilities, and other construction. Provide photographs or video of conditions that might be misconstrued as<br />

damage caused by pile driving. Comply with Division 1 Section 01322 "Photographic Documentation."<br />

PRESTRESSED CONCRETE PILES 02457 - 3