501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

5. Control Selector Switches (to be located behind the exterior door)<br />

a. Auto/Manual Main-Tie-Main Breaker Control two-position selector switch<br />

b. Open/Close two-position spring-return-to-center selector switch for each breaker (three total)<br />

1) “Close” control only enabled if Auto/Manual control selector is in the “Manual” position<br />

2) “Close” control is electrically interlocked to prevent both main breakers and tie breaker from<br />

being closed concurrently.<br />

6. Sequence of Operation – Automatic Control<br />

a. Upon obtaining a signal from the main “A” 27/47 monitoring relay (indicating a problem with the<br />

incoming power source), a time delay of 120 seconds (adjustable up to 600 seconds minimum)<br />

shall be activated. If the timer times out, a “loss of power source” condition shall be latched.<br />

b. When the signal from the main “A” 27/47 monitoring relay is no longer present (indicating that the<br />

incoming power source has returned to acceptable operating parameters), a stabilization time<br />

delay of 15 minutes (range adjustable from at least 1 to 60 minutes) shall be activated. If the timer<br />

times out, the “loss of power source” condition shall be unlatched.<br />

c. An LED indicator light shall indicate the presence of each main incoming power source.<br />

d. “Loss of power condition” monitoring for main “B” is similar to main “A”.<br />

e. If the control is in automatic and one main source is in a “loss of power source” condition and the<br />

other main source is not in a “loss of power source” condition, the following sequence shall take<br />

place:<br />

1) The main breaker on the failed side shall open, then<br />

2) After a 5 second delay (range adjustable from at least 1 to 30 seconds) the tie breaker shall<br />

close.<br />

f. While the tie breaker is closed, when the main source’s “loss of power source” condition is no<br />

longer present, the following sequence shall take place:<br />

3) The tie breaker shall open, then<br />

4) After a 5 second delay (range adjustable from at least 1 to 30 seconds) the main breaker shall<br />

close.<br />

7. Anti-race condition interlocks shall prevent initiation of transfer if both incoming main power sources fail<br />

concurrently.<br />

8. Automatic transfer to an incoming main power source shall be inhibited if its 27/47 relay detects a<br />

problem with that power source (regardless of whether or not its timers have time out).<br />

8. No transfers will be initiated if one of the main or tie breakers trips due to an overcurrent or ground-fault<br />

condition. All such trips must be reset before normal operations can commence.<br />

12 KV – 480/277V SECONDARY DOUBLE-ENDED UNIT SUBSTATIONS 16371-9