Vision 2000 additional facilities:<br />

<strong>Construction</strong> of channel for Berths 57/58 Wharf,<br />

fill, demolition, gates and yard; construction of Berth 59 channel, bank, berth and<br />

yard behind “Berth 59”; expansion of Knight RR yard; wharf and channel<br />

modifications, embankment; related work including mitigation for historic<br />

structures, traffic and water quality associated with Vision 2000 projects;<br />

construction of new road; Joint Intermodal Terminal Phase 2; and construction of<br />

Middle Harbor Park.<br />

Other Maritime Division expansion and modernization:<br />

Those projects, known or<br />

currently unknown, for which the estimated cost exceeds $50,000 that appear on the<br />

Capital Improvement Program list for the Maritime Division and have been<br />

advertised for bid, invitations to bid have been made, or solicitation for proposals<br />

from contractors or sub-contractors have been issued on or before December 31,<br />

2004.<br />

The Aviation Development Program:<br />

Terminal expansion:<br />

Expansion of both existing air passenger terminals by up to<br />

750,000 gross square feet. Terminal expansion will provide 12 additional aircraft<br />

parking and loading gates, as well as new concourse, circulation and waiting areas,<br />

and new passenger service facilities (e.g., ticketing, baggage claim).<br />

Landside Access:<br />

<strong>Construction</strong> of the Airport Roadway Project; a six-story parking<br />

garage; realignment, widening, and double-decking of the Airport Drive terminal<br />

loop; and relocation of existing parking and rental car facilities displaced by<br />

construction of other project components, as well as construction of additional<br />

permanent parking and rental car facilities.<br />

Airline and Airport Support: <strong>Construction</strong> of a building of up to 15,000 gross square<br />

feet to expand existing MOIA in-flight provisioning capabilities; consolidation of<br />

existing ground vehicle equipment service facilities (fueling, service, and storage) at<br />

a single site; relocation of the existing MOIA jet-fuel dispensing facility; and<br />

expansion of the existing United Airlines maintenance base.<br />

Other Aviation Division expansion and modernization:<br />

Those projects, known or<br />

currently unknown, for which the estimated cost exceeds $50,000 that appear on the<br />

Capital Improvement Program list for the Aviation Division and that have been<br />

advertised for bid, invitations to bid have been made, or solicitation for proposals<br />

from contractors or sub-contractors have been issued on or before December 31,<br />

2004.<br />

(b) Port Work (Notice): Immediately upon determining which company is the<br />

apparent low bidder for any work on the Project, and not later than 48 hours after<br />

such determination, the Port shall notify the Building Trades Council of the<br />

PORT OF OAKLAND MARITIME AND AVIATION PLA<br />