04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

END OF SECTION 16320<br />

(2) Upon reviewing the results, the tester shall submit the findings<br />

and render a written summary as to the conditions of the<br />

installation.<br />

(3) Tester shall make a determination as soon as the testing is<br />

complete as to whether or not the system should be energized.<br />

(4) If at any time the test procedure is stopped due to excessive<br />

readings, the installation shall be checked to locate problems and<br />

recommend corrective measures before.<br />

12KV CONDUCTORS 16320-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!