501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

E. Installation of drain lines from evaporative coils, properly insulated, shall be included in<br />

this contact.<br />

F. Sleeves for refrigeration lines, drain lines and electrical lines shall be of extruded vinyl,<br />

E.C. shall furnish and install seal-off fixtures in conduit for each light fixture to prevent<br />

moisture from collecting in fixture. Coil supports to be provided in reinforced ceiling panels<br />

to hang cooling coils. Mounting nuts and bolts which extend through the ceiling of walk-in<br />

shall be of stainless steel.<br />

G. Condensate and drain lines shall be extended nearest existing floor drain. All lines shall<br />

be hard copper, using sweat fittings for all bends and turns. Lines for freezer coils shall be<br />

wrapped with a thermostatically controlled heater tape or factory installed integral heater.<br />

Cover drain liens with insulation required.<br />

3.2 TESTING, START-UP AND INSTRUCTIONS<br />

A. General: Delay start-up of free-standing freezer/cooler until services lines have been<br />

tested, balanced and adjusted for pressure, voltage and similar considerations.<br />

B. Test each item of operational equipment to demonstrate that it is operating properly and<br />

that controls and safety devices are functioning. Repair or replace equipment that s found<br />

to be defective in its operating, including units which are below capacity or operating with<br />

excessive noise or vibration.<br />

C. Instruct owner’s operating personnel in proper operation and maintenance procedures for<br />

each item of operation equipment.<br />

D. Final cleaning: After testing and start-up and before the time of substantial completion,<br />

clean and sanitize equipment and heave in condition ready for use.<br />

END OF SECTION 13100<br />

WALK-IN COOLERS AND FREEZER 13100-9