20.01.2013 Views

RecTrac 10.1 Reference Guide

RecTrac 10.1 Reference Guide

RecTrac 10.1 Reference Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>RecTrac</strong> <strong>10.1</strong> <strong>Reference</strong> <strong>Guide</strong><br />

Chapter 4: End of Day, Week, Month, Season and Year<br />

Procedures<br />

Period End Processing Overview<br />

The following procedures and the recommended frequency with which each procedure should be<br />

run (end of season, end of year, etc.) are provided for reference purposes only. These<br />

recommendations seek to balance database size with program performance and information<br />

availability. Adjust the frequency of these procedures to meet your own organization’s needs.<br />

Each procedure is listed as one of the following:<br />

• Required – Procedures should be run as directed or the system will malfunction or provide incorrect information.<br />

• Should Be Done – Procedures may hinder efficiency and speed if they are not done, but will not cause the<br />

system to malfunction if not completed.<br />

• Optional – Procedures may be done on an optional basis and will not have an adverse affect if they are not<br />

completed.<br />

Note: Any procedure related to a module that is not installed on your system is not required (even<br />

if it is listed as required).<br />

Processes Not Covered Here:<br />

Yearly, seasonal, or occasional pricing and date (activation or expiration) changes may require<br />

that you update file maintenance records in any module. Do so at any time if the need arises.<br />

If you have a question related to running the actual program, press F1 for field-level Help from<br />

any screen.<br />

How Far Back to Purge:<br />

VSI recommends saving at least 2 years of data in your database if disk space and application<br />

performance and speed are not issues.<br />

For example, if you wish to purge at 2006 year-end, do not include the current year (2006) or<br />

previous year (2005) in your purge date range. You would purge only from 1/1/1985 –<br />

12/31/2004.<br />

End of Day Procedures<br />

What to Do at End of Shift/Day<br />

Each user should follow these steps at the end of the shift or day:<br />

1 If applicable, run the Rental End-of-Day program (Daily � Rent) to print lists of the rental items that should have<br />

either been returned or picked up by the current system date/time but have not yet been returned or picked up.<br />

The program can also process auto returns, allowing you to automatically return rental items without having to<br />

return the item for each household through the Rental Check Out/Check In program. When processing auto<br />

returns, no fees are processed. It is therefore recommended that you only process auto returns for rental items to<br />

which no fees are attached or for which you collect all payments in advance.<br />

2 Remove your cash drawer and count your cash.<br />

3 Total the refund vouchers that you’ve printed out that day. Treat them as a separate tender type.<br />

4 Run the Global Refund Report (Reports � Global � Global Financial Reports). You might attach to this report all<br />

refund vouchers printed for that day.<br />

5 Run the Cash Journal (Reports� System � System Financial Reports) with a balancing worksheet. Make sure<br />

to use your pre-defined selection criteria.<br />

6 Enter your cash totals on the balancing worksheet.<br />

7 Run the GL Distribution Report (Reports� System � System Financial Reports) for the same selection range as<br />

you used for the Cash Journal.<br />

Vermont Systems, Inc. 309 06/09/08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!