20.01.2013 Views

RecTrac 10.1 Reference Guide

RecTrac 10.1 Reference Guide

RecTrac 10.1 Reference Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>RecTrac</strong> <strong>10.1</strong> <strong>Reference</strong> <strong>Guide</strong><br />

Court Reservation Procedures<br />

Number of Available Court Slots is Incorrect<br />

Run the Court Reservation Recalc Program (Utilities � Court � Court Reservation Recalc). Press<br />

F1 for field-level Help as needed.<br />

Adjusting Court Reservation Max Counts<br />

Run the Court Reservation Max Count Adjustment program (Utilities � Court � Court Max Count<br />

Adjustment). Press F1 for field-level Help as needed.<br />

Locker Procedures<br />

Changing the Locker Reservation Status<br />

The Locker Rental History Status Change program allows the system to change any rented<br />

locker's internal status. This status does not appear on any File Maintenance screen. It is used as<br />

an internal flag for the rental processing program. The internal status is changed to "C" (for<br />

Complete) if that locker's rental period ends on or before the "Process Date" entered on this<br />

screen. The internal status is changed to "I" (for Impound) if the "Process Date" entered on this<br />

screen falls within that locker's grace or impound period. See the "Process Date" field description<br />

below for more details.<br />

Note: This program may be run on a regular basis, especially for those organizations that have<br />

thousands of lockers in their database. In these instances, running this program may allow the<br />

system to find an available locker more quickly during the locker rental process.<br />

1 Go to Period End � Lock � Locker Rental History Status Change.<br />

2 In the Beginning Locker Room and Ending Locker Room fields, enter the range of locker rooms for which you<br />

wish to change the internal reservation status.<br />

3 In the Beginning Locker and Ending Locker fields, enter the range of locker numbers for which you wish to<br />

change the internal reservation status.<br />

4 Enter a Process Date that will be used to determine the following change processes:<br />

• Any locker reservation (that falls within the ranges selected above) that has a rental period ending date that<br />

ends on or before the date selected here, will have its status changed to C (complete).<br />

• Any locker reservation (that falls within the ranges selected above) that has an impound period ending date that<br />

ends on or before the date selected here, will also have its status changed to C (complete).<br />

• If the process date entered here falls between a rental reservation’s rental period ending date and the impound<br />

period ending date, that reservation will have its status changed to I (Impound).<br />

5 Select the Charge Impound Fee option if you want to charge impound fees for each locker coded as Complete.<br />

Note: This option applies only to those lockers for which an Impound Period has been<br />

established.<br />

6 Select the Use Deposit to Pay Impound Fee option if you selected to charge impound fees and you want the<br />

collected deposit to pay for the impound fee.<br />

Note: This option applies only to those lockers for which an Impound Period has been<br />

established.<br />

7 In the Pay Code field, enter or select the pay code that you want to use to pay the required amounts.<br />

8 Enter or select the pay drawer that will be used to process payment.<br />

9 Enter or select the user who will process the payment for this locker reservation process.<br />

10 Click Process.<br />

11 When the locker status conversion is complete, a message box will display to notify you. Click OK.<br />

12 Click Exit.<br />

Vermont Systems, Inc. 433 06/09/08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!