MMX – Brazilian ProjectsAmapa – July 06,2006Production Units Productivity Amounttonnes pig / year 2.32 2,000,000Operating cost estimate Units Unit cost Consumption Cost Cost($US /unit) (units/tonne pig) ($US /t pig) (R$ /t pig)raw materialssinter t sinter 47.8 1.61 77 181nutcoke t nutcoke 136.0 0.48 66 155coal (PCI) t PCI 125.0 0.12 15 35limestone t limestone 13.0 0.08 1 2quartz t quartz 10.0 0.04 0.4 1sub total materials 159 374conversion costslabor 1 2electricity 2 6water, compressed air 2 5maintenance 0 1internal transportation 3 7other costs 1 2subtotal conversion 10 22total MBF production cost 169 397transportationMBF Plant Brazil to Port 3 6stockpile and load Panamax ship 5 11Total Pig Iron Transportation Estimate Costs from MBF Brazil 7 17total cost pig, FOB MMX Port 176 414Source : MMX, Hatch estimates and analysisNote 1: MMX’s estimated market costs for iron ore are used in the sinter plant operating costs, considering supply bylocal mining companies including Sólida Mineração S.A., Mineração Eldorado S.A., and MMX’s subsidiary operating inAmapá. Iron ore prices provided by MMX quoted before May 15, 2006, price increase.Tabela 2-7: Estimativa de custo operacional do Mini-Alto Forno (ver Obs. 1)402

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!