MMX – Brazilian ProjectsAmapa – July 06,20062.4 Capital Spending estimatesThe following table shows a summary of the capitalspending estimates for the Amapá project. These areconceptual level, order of magnitude estimates only.2.4 Estimativas de investimentoA tabela abaixo mostra um resumo das estimativas deinvestimento para o projeto do Amapá. Trata-se somentede estimativas em nível conceitual, e em ordem demagnitude.Table 2-11: Capital Spending estimate for AmapaItem Capital Cost Source(million $US)Amapa Port 26.8 MMXHPS Plant (2 plants) 26 MMX3 mtpy capacity totalSinter Plant (2 Plants) 140 MMX3.2 mtpy capacity totalMini Blast Furnaces (10 plants) 310 same as Corumba2 mtpy capacityBasic Oxygen Furnace 55 Hatch estimate0.5 mtpy capacityLadle Furnace 7.4 MMXLadles (9) 1.1 MMXBillet Caster 18 MMX0.5 mtpy capacitySubtotal 584.3Contingency (10%) 58.4 MMXTotal Capex 643Note: Amapá Port investment refers to the investment required to adapt Port facilities to export pig iron and billets.410

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!