Andhra Pradesh<br />

The system availability has been always above 99 per cent and the cost <strong>of</strong><br />

recovery has improved to over 100 per cent.<br />

4.2.3 Network Expansion<br />

APTRANSCO initially received investment support from the World Bank for<br />

the vital projects <strong>of</strong> network expansion and strengthening. The first 400 kV<br />

transmission project was completed with investment support provided by<br />

OECF (presently Japanese Bank for International Co-operation or JBIC in<br />

short). Financial assistance was also received from PFC and REC for the<br />

transmission projects <strong>of</strong> APTRANSCO. The table below gives an indication <strong>of</strong><br />

the increased investments in the transmission before and after restructuring;<br />

Before Restructuring After Restructuring<br />

Years<br />

Investment<br />

(Rs crore)<br />

Years<br />

Investment<br />

(Rs crore)<br />

1995-96 99.57 1999-00 424.19<br />

1996-97 60.96 2000-01 420.14<br />

1997-98 115.29 2001-02 459.11<br />

1998-99 205.00 2002-03 362.62<br />

2003-04 248.01<br />

2004-05 415.38<br />

The transmission network expansion after restructuring is indicated in the table<br />

below:<br />

Item<br />

At the end <strong>of</strong> the<br />

Year<br />

1998-99 2004-05<br />

1.32<br />

Total<br />

Increase<br />

Average<br />

Annual<br />

Increase<br />

400 kV lines (ckt km) - 2,033 2,033 339<br />

220 kV lines (ckt km) 8,203 11,462 3,259 543<br />

132 kV lines (ckt km) 10,634 13,351 2,717 453<br />

400 kV sub-stations (No.) - 3 3 1<br />

220 kV sub-stations (No.) 56 78 22 4<br />

132 kV sub-stations (No.) 164 229 65 11<br />

The above figures reveal that greater and focussed attention is being given to<br />

expansion <strong>of</strong> the transmission network after the creation <strong>of</strong> APTRANSCO.<br />

4.2.4 Way Forward<br />

APTRANSCO is among the best performing transmission companies in the<br />

country. The company has made sizeable investments and strengthened the<br />

transmission network. However, there is scope for further improvement as<br />

indicated below: