Uttar Pradesh<br />

CGS Stations Capacity (MW)<br />

NTPC<br />

Singrauli 754<br />

Auriya 209<br />

Rihand 326<br />

Anta Gas 91<br />

Dadri Thermal 84<br />

Dadri Gas 242<br />

Unchahar I 250<br />

Unchahar II 129<br />

Tanda 440<br />

NHPC<br />

Salal 48<br />

Tanakpur 21<br />

Chamera 109<br />

Uri 96<br />

NPC<br />

NAPP 138<br />

RAPP 43<br />

Total 2,980<br />

OPERATIONAL PERFORMANCE IN GENERATION<br />

UPRVUNL has taken initiatives to improve the operational performance <strong>of</strong> the existing<br />

generating stations during the post-reform period. The trend <strong>of</strong> the key generation<br />

parameters is indicated in the table and the chart below:<br />

Particulars 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04<br />

PLF (%) 47.48 49.24 49.13 49.14 50.55 57.19 59.76 61.18 60.13<br />

Oil consumption<br />

(ml/kWh)<br />

4.98 3.86 4.51 5.89 5.3 2.69 2.3 2.24 2.07<br />

Auxiliary<br />

consumption (%)<br />

9.64 9.75 10.22 9.86 10.36 10.31 10.23 10.31 10.22<br />

Plant Availability (%) 64.89 72.07 74.03 73.28<br />

After restructuring, there is a consistent improvement in PLF <strong>of</strong> the generating plants.<br />

The PLF has increased by 10 percentage point from the year 1999-2000 (year just prior<br />

to restructuring) to 2003-04. One <strong>of</strong> the reasons for improvement in the operating<br />

parameters is the transfer <strong>of</strong> old and poor performing stations like Tanda (440 MW) to<br />

NTPC and emphasis on R&M <strong>of</strong> the other older stations.<br />

7.13<br />

Composition <strong>of</strong> Installed Capacity (MW)<br />

7412 MW<br />

Share in<br />

CPSUs,<br />

2980, 40%<br />

UPJVNL,<br />

523, 7%<br />

UPRVUNL,<br />

3909, 53%