Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

xi) Orissa is one <strong>of</strong> the few States where 24 hours power supply has been<br />

maintained in most <strong>of</strong> the electrified areas.<br />

II. Stabilisation <strong>of</strong> GRIDCO<br />

GRIDCO, a State PSU, has achieved financial turnaround. The salient features<br />

are as follows:<br />

i) GRIDCO has earned a pr<strong>of</strong>it <strong>of</strong> Rs 417.77 crore in 2003-04 and Rs 357.38<br />

crore during 2004-05.<br />

ii) GRIDCO has traded power worth Rs 638 crore and Rs 1,130 crore during<br />

2003-04 and 2004-05 respectively.<br />

iii) GRIDCO has paid the current dues to the generating companies and FIs in<br />

full from October 2003 till date. It has saved interest to the tune <strong>of</strong> Rs 80<br />

crore per annum through swapping <strong>of</strong> high cost debt.<br />

III. Stabilisation <strong>of</strong> Distribution Companies<br />

The DISCOMs have stabilised and the following features are worth<br />

mentioning:<br />

i) The DISCOMs have streamlined billing function and installed more than<br />

6.5 lakh consumer meters. Meter cubicles, XLPE cables and check meters<br />

have been installed to arrest theft <strong>of</strong> electricity in HT category. Security<br />

guards have been appointed for vigilance duty.<br />

ii) 33 kV and 11 kV feeder metering has been completed. Metering <strong>of</strong> 33/11<br />

kV sub-stations and DTs is in progress.<br />

iii) DISCOMs have formed squads for collection <strong>of</strong> outstanding dues from<br />

consumers and for de-hooking. They have introduced spot billing and<br />

enhanced vigilance activities. Energy audit has been initiated. .<br />

iv) Through measures like establishment <strong>of</strong> Consumer Care Centres and<br />

creation <strong>of</strong> Consumer Grievance Redressal Forums, better consumer<br />

services are being provided.<br />

Central Electricity Supply Company <strong>of</strong> Orissa Limited<br />

While acquiring CESCO, AES was assured that GRIDCO would allow CESCO<br />

cash accommodation up-to Rs 174 crore. This amount, along with interest, was<br />

to be repaid after 1 September 2002. There was a dispute between AES and the<br />

State Government over financing the required working capital over and above<br />

53