iii) Bakreswar TPP Units 4 and 5 (2210 MW);<br />

iv) Durgapur Projects Ltd. Unit 7 (1300 MW); and<br />

v) Santaldihi TPS Unit 5 (1250 MW).<br />

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

In the State Sector, total capacity under execution during the Tenth Plan period is<br />

2,470 MW. For the Eleventh Plan, the State proposes to add 2,550 MW <strong>of</strong> capacity at<br />

five locations.<br />

The commissioning schedule <strong>of</strong> the ongoing projects is as follows:<br />

Bakreswar TPP Unit 4 March 2007, and Unit 5 June 2007. Unit 1 Sagar Dighi TPP is<br />

likely to be commissioned in January, 2007 and Unit-2 in April, 2007. Unit 5 <strong>of</strong><br />

Santaldihi TPS is likely to be commissioned in January, 2007. Unit 7 <strong>of</strong> DPL is also<br />

likely to be commissioned in January, 2007.<br />

TARIFF<br />

The average tariff in West Bengal under the regulatory regime in paise per unit has<br />

been as follows:<br />

Year<br />

Average tariff<br />

(paise per unit)<br />

2000-01 306<br />

2001-02 301<br />

2002-03 342<br />

2003-04 331<br />

Tariff varies from agency to agency, due to historical reasons.<br />

T&D LOSSES<br />

There is significant improvement in this field as would be seen from the following<br />

figures:<br />

Year T&D Losses (%)<br />

2001-02 31.11<br />

2002-03 28.064<br />

2003-04 26.16<br />

2004-05 25.37<br />

12.2