Ageing <strong>of</strong> Generating Units<br />

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

The installed thermal generating capacity <strong>of</strong> 6,425 MW has been de-rated to 6,396<br />

MW. This year MAHAGENCO is preparing to submit proposals to Central Electricity<br />

Authority (CEA) for its approval for further de-rating <strong>of</strong> some old units. About 48 per<br />

cent <strong>of</strong> above thermal capacity is between 15-25 years old and 15 per cent is over 25<br />

years old. Forced outage rates <strong>of</strong> these old machines are high resulting into their<br />

reduced availability. Also with the quality <strong>of</strong> coal available, it is not possible to get<br />

full rated output from these old machines. The consumption <strong>of</strong> oil per kWh <strong>of</strong><br />

generation also increases considerably.<br />

Performance Parameters<br />

The details <strong>of</strong> performance parameters achieved in five years preceding restructuring<br />

and after restructuring are indicated in table below:<br />

Particulars<br />

Table: Technical Parameters<br />

Years before Restructuring<br />

10.26<br />

Years<br />

After<br />

Restructuring<br />

5 th 4 th 3 rd 2 nd 1 st 1 st 2 nd<br />

PLF (%) 72.78 74.34 71.93 75.07 76.62 73.05 77.69<br />

Heat rate (kcal/kWh) 2743 2804 2717 2680 2675 2688 2675<br />

Oil consumption (ml/kWh) 2.54 2.68 2.65 2.18 1.96 2.27 2.00<br />

Auxiliary consumption<br />

(thermal) (%)<br />

8.73 8.82 8.81 8.75 8.74 8.83 8.80<br />

Availability (thermal) (%) 86.06 86.49 83.79 84.64 85.57 81.18 84.41<br />

ABT incentive<br />

Unscheduled breakdowns<br />

in 1000 X MWh (rounded<br />

<strong>of</strong>f)<br />

Total manpower employed<br />

5847 4627 4620 4537 3619 5468 NA<br />

Sanctioned staff: 17,436<br />

Staff filled in: 14,001<br />

It is seen from the above table that despite adverse conditions cited earlier, there has<br />

been improvement in the performance. On account <strong>of</strong> shortage <strong>of</strong> capacity in the<br />

State, units were not spared for carrying out annual overhaul and statutory overhaul<br />

works. This also added to increased forced outage rates. As a result, availability and<br />

Plant Load Factor (PLF), both suffered adversely. The figures for 2 nd year after<br />

restructuring are projections.<br />

Annual Overhaul/Capital Overhaul (AOH/COH), which used to be availed after 18/24<br />

months <strong>of</strong> boiler operation, were progressively taken within 12/18 months <strong>of</strong><br />

operation. In 2005-06, AOH/COH <strong>of</strong> 20 units was completed. 29 units are scheduled