Madhya Pradesh<br />

3.2 OPERATIONAL PARAMETERS<br />

3.2.1 System Losses<br />

While there has been an increase in the quantum <strong>of</strong> energy handled by MPTRANSCO<br />

by about seven per cent in the year 2004-05 over the year 2003-04, there is a significant<br />

achievement in terms <strong>of</strong> reduction <strong>of</strong> transmission losses. The overall losses in<br />

transmission system corresponding to 2004-05 have come down to 5.62 per cent from<br />

6.12 per cent in the year 2003-04. Cumulatively, the losses have been brought down<br />

from 8.25 per cent in 1999-2000 to 5.62 per cent in 2004-05.<br />

Loss Levels in Transmission Network (%)<br />

1997<br />

-98<br />

1998<br />

-99<br />

1999<br />

-2000<br />

Energy available for<br />

transmission (MUs)<br />

30510 33233 34549 26601 26513 27082 27554 29531<br />

Energy delivered (MUs) 28373 30585 31700 24428 24338 24935 25869 27871<br />

Losses (MUs) 2137 2648 2848 2172 2174 2147 1685 1659<br />

Loss (%) 7.01 7.97 8.25 8.17 8.20 7.93 6.12 5.62<br />

(Source: MPTRANSCO)<br />

3.2.2 Establishment <strong>of</strong> State Load Despatch Centre and interconnection with<br />

MPTRANSCO system<br />

The State Government has constituted the existing Load Despatch Centre as State<br />

Load Despatch Centre (SDLC) vide its Order dated 17 May 2004. The SDLC is the<br />

apex body responsible for the operation, planning, monitoring and control <strong>of</strong> the<br />

power systems in the State. The SLDC is well connected with the Western Regional<br />

Load Despatch Centre (WRLDC) for efficient and integrated operation <strong>of</strong> the Grid.<br />

4.33<br />

2000<br />

-01<br />

3.3. TRANSMISSION SYSTEM AVAILABILITY<br />

3.3.1 Transformer Failure Rate<br />

The data provided by MPTRANSCO suggests that there has been no failure <strong>of</strong> power<br />

transformers during the years 2003-04 and 2004-05.<br />

2001<br />

-02<br />

2002<br />

-03<br />

Failure <strong>of</strong> <strong>Power</strong> Transformers in MPTRANSCO<br />

Particulars 1996-97 1997-<br />

98<br />

1998-<br />

99<br />

1999-<br />

2000<br />

2000-<br />

01<br />

2001-<br />

02<br />

2002-<br />

03<br />

2003<br />

-04<br />

2003-<br />

04<br />

2004<br />

-05<br />

2004-<br />

05<br />

Failure rate (%) 3.16 3.04 3.58 2.89 3.28 3.78 3.00 0.00 0.00<br />

(Source: MPTRANSCO)