04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

cent in 2000-01 to 79 per cent in 2004-05. Even, the collection efficiency for<br />

industrial and commercial categories <strong>of</strong> consumers is showing a declining<br />

trend.<br />

T&D/AT&C Losses: The percentage T&D losses from 1995-96 to 1998-99<br />

were shown to be in the range <strong>of</strong> 19 to 21 per cent before restructuring. After<br />

restructuring, the losses were revised to 31.94 per cent in 1999-2000 and 47.18<br />

per cent in 2000-01. The reduction in the loss levels after restructuring has been<br />

slow and losses dropped only by less than 3 per cent in four years (43.48 per<br />

cent in 2004-05). MPERC has fixed higher targets for loss reduction in its tariff<br />

order <strong>of</strong> 31 March 2006 by 26 to 27 per cent, in respect <strong>of</strong> the three DISCOMs<br />

by 2008-09, as indicated in Table 4.2.<br />

DISCOM<br />

Table 4.2: Level <strong>of</strong> AT&C losses in DISCOMs (%)<br />

Prescribed By the Commission Indicated by the DISCOMs<br />

2005-06 2006-07 2007-08 2008-09 2005-06 2006-07<br />

Poorv Kshetra 35.5 32.5 29.5 26.5 38.73 35.88<br />

Paschim Kshetra 31.7 30 27.5 25 31.5 30<br />

Madhya Kshetra 41.6 37 32 27.5 41.6 38<br />

(Source: MPERC)<br />

Target for AT&C Losses (%) in 2005-06, as prescribed by the Commission,<br />

has been achieved by Paschim Kshetra and Madhya Kshetra DISCOMs,<br />

whereas the same has not been achieved by the Poorv Kshetra DISCOM.<br />

It appears that, after restructuring, the loss levels as being indicated have been<br />

revisited to get a realistic figure <strong>of</strong> losses in power systems.<br />

The targets <strong>of</strong> AT&C losses given in the FRP are not in conformity with those<br />

prescribed by MPERC. The targets prescribed by the Commission are aimed at<br />

bringing these losses closer to the level <strong>of</strong> 15 per cent (as mandated in the<br />

National Tariff Policy). In view <strong>of</strong> the above, there is a fresh need to look at the<br />

targets set for AT&C losses in FRP, so that these are in conformity with those<br />

fixed by the Commission.<br />

Anti Theft Measures: For checking and prevention <strong>of</strong> theft <strong>of</strong> electricity,<br />

Madhya Pradesh Urja Adhiniyam was notified by the State Government on 17<br />

April 2001. Several administrative measures, undertaken by the companies to<br />

check power theft, include: strengthening <strong>of</strong> the Vigilance Squads, replacing<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!