Capital Expenditure<br />

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

While distribution sector holds the key to reforms in the power sector, investments to<br />

bring about reforms have mainly focussed on the generation and transmission sectors<br />

in Haryana. The investment in distribution sector during the entire post-restructuring<br />

period has been around 21 per cent <strong>of</strong> the total investments made in the State power<br />

sector. This was far below the projected level <strong>of</strong> investments, which were estimated<br />

for distribution sector. A detailed break-up <strong>of</strong> the capital investments on yearly basis<br />

is provided in the tables below.<br />

Table: Capital Investments in the Distribution Sector in Haryana<br />

Particulars 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 Total<br />

Distribution 0.00 52.97 132.26 218.04 210.50 228.13 213.80 190.93 1055.70<br />

Total sector 378.60 542.65 510.18 496.45 727.35 1439.98 921.22 754.20 5016.44<br />

Distribution (%) 0 10 26 44 29 16 23 25 21<br />

The table indicates the year-wise increase in capex towards augmentation <strong>of</strong> distribution<br />

network from the level <strong>of</strong> Rs 53 crore in 1999-2000 to around Rs 190 crore in 2005-06. As a<br />

result <strong>of</strong> the capital investment in the distribution network, augmentation and expansion were<br />

undertaken in the post-restructuring period and the results are given in the table below:<br />

Table: Addition <strong>of</strong> Lines, Sub-Stations and Capacitors<br />

Activity 1999-2000 2000-01 2001-02 2002-03 2003-04 2004-05<br />

New distribution Lines (ckt km)<br />

33 kV - - - - - 247<br />

11 kV 697.53 938.517 1489.639 1874.868 1983.48 2863.461<br />

LT 756.86 577.675 696.446 939.373 2871.55 1099.881<br />

Sub-stations and Capacitors<br />

New 33 kV sub-station<br />

Commissioned<br />

(Capacity in MVA)<br />

36.3 18.3 27.9 24.6 125 174.2<br />

33 kV S/S augmented<br />

(Capacity in MVA)<br />

66.3 66 31.1 112.9 165.6 123.5<br />

Capacitor bank installed<br />

(MVAR)<br />

Status <strong>of</strong> APDRP Funding<br />

- - - - - 46.652<br />

2.42<br />

(Source: DISCOMs)<br />

The DISCOMs in Haryana have received funding under the APDRP scheme as<br />

elaborated in Annexure-IV. The DISCOMs have been making efforts to utilise the