11.3 Distribution<br />

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

AT&C losses have been around 41 per cent. The final appraisal carried out by<br />

the ADB states that with the efficiency improvements and investments in the<br />

transmission and distribution sectors for upgrading the network, the target is to<br />

bring them to 25 per cent in the year 2007-08 which includes reduction in the<br />

technical loss from 18 per cent to 14 per cent and commercial loss from 14 per<br />

cent to 5 per cent. There is no perceptible reduction in the AT&C losses yet.<br />

M/s PricewaterhouseCoopers have been given a project assignment for training<br />

and support for loss estimation and loss reduction in the distribution system.<br />

The consultant will determine the total losses in the feeders and also identify<br />

the areas where higher losses are occurring. Consultants were also to carry out<br />

studies to segregate the technical and commercial losses and also train the<br />

DISCOMs field staff in the estimation methodology and techniques. The<br />

causes and estimation <strong>of</strong> the commercial losses due to various reasons like<br />

tampered meters, under-billing, under-recorded loads, etc., is also to be done.<br />

Pilot studies for reduction in commercial losses on the basis <strong>of</strong> the monitoring<br />

<strong>of</strong> consumer installation; on the job training to the DISCOMs staff is also in the<br />

scope <strong>of</strong> the study. This consultancy assignment is still under way. For<br />

handling <strong>of</strong> cases <strong>of</strong> electricity theft, exclusive courts have not been set up but<br />

the senior-most Sessions Judge has been asked to handle such cases. The<br />

billing is partially computerised and the plan is for fully computerised billing in<br />

the current year. The frequency <strong>of</strong> meter reading and billing is monthly.<br />

However, 100 per cent metering at the 11 kV feeder level has been achieved.<br />

Information Systems will improve after computerised billing is implemented<br />

on a large scale.<br />

The DISCOMs have not prepared separate unit cost for various categories <strong>of</strong><br />

consumers like, agricultural, domestic and industrial. About 46 per cent <strong>of</strong><br />

energy is supplied to domestic category, 15 per cent to industrial, 10 per cent to<br />

commercial and about 29 per cent to tea gardens and agricultural consumers,<br />

etc. Being in the transition period, commercial and financial capacity building<br />

is taking place. The schemes covered under APDRP are being implemented<br />

actively in various circles. Out <strong>of</strong> an amount <strong>of</strong> Rs 174 crore received under<br />

APDRP, Rs 171 crore has been utilised so far.<br />

Single Point <strong>Power</strong> Supply through Franchisee Scheme has been introduced to<br />

provide better electricity service to the rural population. Targets have been set<br />

8.16