04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

has been around 34.36 per cent. The details <strong>of</strong> capacity and energy generated<br />

and technical parameters are as under:<br />

Table: Total Generating Capacity (MW)<br />

Category 2000 2001 2002 2003 2004<br />

-01 -02 -03 -04 05<br />

Hydel 2.0 2.0 2.0 2.0 2.0<br />

Thermal 300.0 300.0 300.0 300.0 300.0<br />

Gas 272.9 272.9 272.9 272.9 272.9<br />

Total 574.9 574.9 574.9 574.9 574.9<br />

Total Energy Generated (in MUs)<br />

Category 2000 2001 2002 2003 2004<br />

-01 -02 -03 -04 -05<br />

Hydel 0.0 0.0 0.0 0.0 0.0<br />

Thermal 96.7 46.2 0.0 0.0 0.0<br />

Gas 838.2 794.2 746.1 710.7 756.4<br />

Total 935.0 840.4 746.1 710.7 756.4<br />

Table: Improvement in the Technical Parameters<br />

Particulars<br />

2000 2001 2002 2003 2004<br />

-01 -02 -03 -04 -05<br />

PLF (%) 21.6 19.4 33.5 31.9 34.0<br />

Heat rate<br />

4145 4145 3956 3736 3322<br />

Sp. oil consumption (ml/kWh)<br />

56.1 64.5 ---- ---- ----<br />

Sp. gas consumption (M 3 /kWh)<br />

0.4216 0.4479 0.4563 0.4301 0.3876<br />

Auxiliary consumption (%) 7.1 6.3 5.3 4.7 4.7<br />

Plant availability (%) 30.6 33.2 49.9 47.7 49.3<br />

ABT Incentive<br />

Unscheduled breakdowns<br />

In terms <strong>of</strong> MWH 435694 421701 448986 540694 447519<br />

Total manpower employed 1547 1497<br />

(b) Transmission System<br />

The length <strong>of</strong> the transmission system (220 kV, 132 kV and 66 kV) is 4129 ckt<br />

km. The transmission loss is about 9 per cent. The system does not have<br />

sufficient capability to meet the entire demand <strong>of</strong> Assam. Vital strategic<br />

transmission links need to be developed to enable the State to fully avail the<br />

energy from the Central sector generation projects coming up in the region.<br />

The lack <strong>of</strong> investment in the transmission sector has contributed to power<br />

8.2