Gujarat<br />

Payment <strong>of</strong> bills is accepted at post <strong>of</strong>fices and at outsourced agencies.<br />

Data about complaints handled is not maintained at headquarters level. Data regarding<br />

consumer complaints received in Vadodara city circle is given in the table below:<br />

Details <strong>of</strong> Complaints Handled in Vadodara City Circle<br />

Year<br />

No. <strong>of</strong><br />

consumers<br />

Bills<br />

Issued<br />

No power<br />

complaints<br />

Meter<br />

complaints<br />

Billing<br />

complaints<br />

Payment<br />

complaints<br />

2002-03 435460 2671980 121851 9921 7014 4152<br />

2003-04 457324 2800806 114514 9561 6624 3659<br />

2004-05 479876 2952552 104702 9291 5987 3376<br />

2005-06 508522 2979546 83562 5542 3562 3012<br />

From the above, it is seen that the level <strong>of</strong> complaints have reduced considerably after<br />

implementation <strong>of</strong> GIS in 2005-06.<br />

Regulatory Issues<br />

Gujarat Electricity Regulatory Commission was established in 1998. ARR petitions<br />

were filed by the erstwhile GEB in 1999-2000 and 2004-05 and the Commission had<br />

passed its orders on these. All DISCOMs filed ARRs for 2005-06 and 2006-07 in<br />

January 2006 and the Commission has issued its orders for the year 2006-07 in respect<br />

<strong>of</strong> each DISCOM.<br />

The Commission has issued Regulations in respect <strong>of</strong> Open Access. These are to be<br />

made applicable in two phases as given below:<br />

Phase Load Level Effective from<br />

I 5 MW and above<br />

After intra-State ABT is put in place or<br />

1 January 2006, whichever is later<br />

II 1 MW and above 2 years after introduction <strong>of</strong> phase I<br />

The Commission has issued a draft concept paper on MYT in August 2004 for<br />

comments by stakeholders and the general public. Further action is awaited.<br />

The Commission has issued Regulations in January 2005 defining performance <strong>of</strong><br />

utilities in safety, complaint handling, quality <strong>of</strong> power, reliability <strong>of</strong> the system,<br />

complaints about meters/metering systems, release <strong>of</strong> new connections, complaints<br />

about billing, reconnection <strong>of</strong> supply, issue <strong>of</strong> temporary supply, etc.<br />

Forum for redressal <strong>of</strong> consumer grievances has been established and implementation<br />

<strong>of</strong> anti-theft measures is in place. Progress <strong>of</strong> extending agricultural supply through<br />

meters is around 30 per cent.<br />