04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

2000-01 Tariff order 2001-02 Tariff order 2003-04 Tariff order<br />

Interest charges 1239 1127 1308 1110 1308 1126<br />

Lease rent 85 85 85 85 85 85<br />

Provision for doubtful<br />

200 200 200 170 250 181<br />

debts<br />

Other debits 317 277 251 255 248 206<br />

Total expenses allowed 12733 12156 12788 12353 13790 12943<br />

Cost (Rs/ kWh) 2.15 2.05 2.15 2.02 2.16 2.07<br />

Non-tariff Orders<br />

Besides the tariff orders mentioned above, MERC issues a number <strong>of</strong> non-tariff orders<br />

from time to time. In 2005 and 2006 a total <strong>of</strong> 17 non-tariff orders have been issued so<br />

far. These, inter-alia, include Compliance <strong>of</strong> order dated 13 July 2004 regarding<br />

provision <strong>of</strong> meters by MSEB, passing on tax on sale <strong>of</strong> electricity to industrial and<br />

commercial consumers by MSEB. Demand forecast methodology for long-term<br />

purchase <strong>of</strong> power through competitive bidding by MSEDCL. General conditions and<br />

special conditions applicable to distribution licensees, principles and protocol for load<br />

shedding by MSEDCL, Order on proposal <strong>of</strong> Confederation <strong>of</strong> <strong>Indian</strong> Industries for<br />

generating power from captive power plant to remove load shedding in Pune, etc.<br />

Other Important Regulations<br />

MERC has issued following important regulations among others:<br />

• ‘Consumer Grievance Redressal Forum and Ombudsman Regulations’;<br />

• ‘Standards <strong>of</strong> Performance and Supply Code’;<br />

• ‘Transmission and Distribution Open Access Regulations’.<br />

The Phases for Distribution Open Access are as follows:<br />

Contract Demand Effective Date <strong>of</strong> Open Access<br />

> 5 MVA Date <strong>of</strong> notification<br />

> 2 MVA < 5 MVA April 1, 2006<br />

> 1 MVA < 2 MVA April 1, 2007<br />

Currently no consumer in MSEDCL has opted for Open Access.<br />

MERC has made MYT effective from 1 April 2007. MSEDCL has initiated action to<br />

formulate a structure for this phase.<br />

10.50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!