04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gujarat<br />

Category <strong>of</strong> connection<br />

% Checks planned<br />

in a year<br />

High tension 95<br />

Low tension 83<br />

Residential 30<br />

Commercial 40<br />

Agricultural 26<br />

In addition to the above, special checking drives are conducted by the vigilance<br />

department (head <strong>of</strong>fice). Details are given below:<br />

Details <strong>of</strong> Checking in Special Drives<br />

Particulars 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Preventive raids 27 44 53 50 37<br />

Penalty amount<br />

(Rs crore)<br />

14.71 57.50 59.18 42 23.19<br />

It is noted that the vigilance activities are not hindered by any political interference.<br />

The results <strong>of</strong> these efforts seem to be fruitful.<br />

Commercial<br />

Progress <strong>of</strong> Metering:<br />

Except for the agricultural consumers, all other consumers are supplied energy<br />

through meters. 29.48 per cent <strong>of</strong> agricultural connections have been provided with<br />

meters till March 2006.<br />

Details <strong>of</strong> Cost <strong>of</strong> <strong>Power</strong> and Recovery<br />

(Rs/kWh)<br />

Particulars<br />

2000<br />

-01<br />

2001<br />

-02<br />

2002<br />

-03<br />

2003<br />

-04<br />

2004-<br />

05<br />

I Cost to Serve 3.51 3.36 3.46 3.88 3.52<br />

II Recovery<br />

a Agricultural 0.15 0.16 0.21 0.27 0.48<br />

Agricultural tariff<br />

0.37 0.58 0.74 0.80 0.98<br />

compensation<br />

b Domestic 2.54 2.69 2.71 3.10 2.96<br />

c HT industrial 4.36 4.34 4.24 4.21 4.35<br />

d LT industrial 4.04 4.42 4.29 4.21 4.14<br />

e LT commercial 4.40 4.68 4.67 4.78 4.65<br />

f <strong>Public</strong> lighting 3.12 3.35 3.26 3.28 3.35<br />

g Railways 4.96 5.08 4.96 5.10 5.04<br />

h Water works 1.51 2.25 2.69 2.77 2.73<br />

i Licensees 2.81 2.99 2.84 2.90 2.77<br />

J Overall average 1.93 2.21 2.46 2.65 2.85<br />

9.29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!