04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maharashtra<br />

GENERATION<br />

Installed Capacity<br />

SPECIFIC ISSUES<br />

The installed capacity <strong>of</strong> MSEB in the year 2000-2001 was 9,771 MW comprising <strong>of</strong><br />

2,434 MW Hydro, 6,425 MW Thermal, and 912 MW Gas. The table below gives the<br />

details <strong>of</strong> capacity additions and the energy generated from 2001 onwards. It will be<br />

noted that in the period from 2000-01 till 2005-06, there has been no significant<br />

addition to the capacity except for addition <strong>of</strong> 6 MW <strong>of</strong> Hydro Generation. In fact,<br />

with the scraping <strong>of</strong> one 60 MW Gas based unit in the year 2003-04, total capacity got<br />

reduced from 9,771 MW to 9,711 MW. These assets are now transferred to<br />

MAHAGENCO.<br />

Table: Installed Generating Capacity<br />

Sector<br />

Year before restructuring<br />

5<br />

Year after restructuring<br />

(MW)<br />

th 4 th 3 rd 2 nd 1 st 1 st 2 nd 3 rd 4 th 5 th 6 th<br />

Hydro 2434 2434 2434 2434 2440 2440 2690 2690 2690 2690 2690<br />

Thermal 6425 6425 6425 6425 6425 6425 6925 6925 7425 9425 12025<br />

Gas 912 912 912 852 852 852 852 852 852 3292 3292<br />

Total 9771 9771 9771 9711 9717 9717 10467 10467 10967 15407 15407<br />

Restructuring w.e.f. 06-06-2005<br />

Table: Energy Generated<br />

Sector<br />

5<br />

Year before restructuring<br />

(MU)<br />

Year after restructuring<br />

th 4 th 3 rd 2 nd 1 st 1 st 2 nd 3 rd<br />

4th<br />

Hydro 3738 3675 4184 4093 4079 5465 3823<br />

Thermal 38719 41651 40304 42178 42929 40928 45279<br />

Gas 3473 3692 3891 4006 4115 3777 3800<br />

Total 45930 49018 48379 50277 51123 50170 52902<br />

Because <strong>of</strong> the stagnant generating capacity, the State has been experiencing difficulty<br />

in meeting peak demand. The quantum <strong>of</strong> load shedding <strong>of</strong> 1,822 MW in 2000-01<br />

progressively increased to 4,539 MW in 2005-06. This has forced an increasing<br />

quantum and duration <strong>of</strong> load shedding for every consumer served by the erstwhile<br />

MSEB and now the MSEDCL.<br />

10.25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!