MW<br />

5000<br />

4000<br />

3000<br />

2000<br />

1000<br />

0<br />

Thermal and Hydel installed capacity in UP<br />

1995-<br />

96<br />

1996-<br />

97<br />

1997-<br />

98<br />

1998-<br />

99<br />

Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

1999-<br />

2000<br />

82<br />

2000-<br />

01<br />

Hydel Thermal<br />

2001-<br />

02<br />

2002-<br />

03<br />

2003-<br />

04<br />

It is, however, heartening to note that plans now are afoot to install new<br />

generating capacity in the State to remedy the prevailing situation <strong>of</strong> demandsupply<br />

deficit. Anpara-C (1,000 MW) Thermal <strong>Power</strong> Project has been<br />

awarded to M/s LANCO <strong>Power</strong> on the basis <strong>of</strong> competitive bidding. M/s<br />

Reliance Energy has also proposed a gas-based station at Dadri in excess <strong>of</strong><br />

3,500 MW with considerable share for Uttar Pradesh. The State has also started<br />

to receive its part-share from the Tehri Hydel station being developed in the<br />

joint sector. However, the new capacities in the State would only be realised<br />

towards the end <strong>of</strong> the Eleventh Plan and the State is likely to face considerable<br />

strain in supply till that period. The State also needs to ensure that the proposed<br />

capacity additions get <strong>of</strong>f the ground to the implementation stage at the earliest<br />

possible.<br />

UPRVUNL has made initiatives to improve operating perfromance levels at the<br />

existing generating stations during the post-reform period as shown in the table<br />

below:<br />

Table: Improvements in Operating Performance Levels: Generating Stations<br />

Particulars 95-96 96-97 97-98 98-99 99-00 00-01 01-02 02-03 03-04<br />

PLF (%) 47.48 49.24 49.13 49.14 50.55 57.19 59.76 61.18 60.13<br />

Oil Consump-<br />

4.98 3.86 4.51 5.89 5.3 2.69 2.3 2.24 2.07<br />

tion (ml/kWh)<br />

Auxiliary Con-<br />

sumption (%)<br />

Plant<br />

Availability (%)<br />

9.64 9.75 10.22 9.86 10.36 10.31 10.23 10.31 10.22<br />

64.89 72.07 74.03 73.28