Gujarat<br />

Investments Made to Improve Generation Capacity and Efficiencies<br />

(Rs crore)<br />

Particulars<br />

2000<br />

-01<br />

2001<br />

-02<br />

200<br />

2-03<br />

2003-<br />

04<br />

2004-<br />

05<br />

200<br />

5-06<br />

New capacity 7 28 24 36<br />

Renovation and<br />

modernisation<br />

21 76 282 38 107 16<br />

From the above tables it is seen that there is no significant addition to the generating<br />

capacity in GSECL in the last six years. The performance in the last two years has<br />

improved significantly, increasing the PLF to 72.48 per cent and availability to around<br />

85 per cent. Oil consumption and unscheduled breakdowns have been reduced.<br />

Considering the fact that almost 90 per cent <strong>of</strong> the plants are about 20 years old, the<br />

performance is commendable.<br />

The manpower deployed per MW <strong>of</strong> installed capacity works out to 1.90.<br />

The company has submitted ARR in Jan 2006 and GERC has given its decision on the<br />

same.<br />

Planning for Capacity Additions<br />

The company has formulated its business plan for the period ending 2011-12. It is<br />

proposed to add 1,887 MW <strong>of</strong> new capacity with estimated investment <strong>of</strong> Rs 5,964<br />

crore and carry out LE and R&M <strong>of</strong> old plants <strong>of</strong> 1,860 MW capacity with estimated<br />

investment <strong>of</strong> Rs 1,904 crore.<br />

Way Forward<br />

Life Extension Works<br />

Estimated requirement <strong>of</strong> investments for Life Extension (LE) works <strong>of</strong> Rs 1,904<br />

crore appears to be on lower side. Government <strong>of</strong> Gujarat has indicated that in the bids<br />

received by it, cost/MW is not in the range <strong>of</strong> CEA estimates and that the agencies to<br />

be entrusted with LE works are reluctant to provide assurance <strong>of</strong> achieving desired<br />

performance levels over a long period. Gujarat has, therefore, almost decided not to<br />

proceed with LE works. Since GSECL is considering investments for LE works in<br />

respect <strong>of</strong> 1,860 MW, almost the same capacity as installation <strong>of</strong> new capacity, it<br />

would be advisable to identify related risks <strong>of</strong> not being able to achieve expected<br />

performance levels even after carrying out LE and R&M works and take suitable<br />

action.<br />

9.23