04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

achievement. A 0.5 per cent reduction <strong>of</strong> transmission losses is targeted during the year<br />

2005-06 and transmission losses are expected to come down to 5.10 per cent.<br />

TRANSCO’s performance has improved after restructuring and it is continuing its<br />

efforts to improve the transmission system in terms <strong>of</strong> higher system availability, low<br />

breakdowns and low failures, reduction in transmission losses and capacity to attract<br />

new capital investment to strengthen the transmission system.<br />

4. DISTRIBUTION SYSTEM<br />

Under O&M agreement with MPSEB, the three DISCOMs in the State started their<br />

operations from July 2002 as franchisees under the MPSEB. The DISCOMs were to<br />

manage the distribution assets, planning and maintenance operation within their<br />

respective areas. The DISCOMs have started their independent operation from 1 June<br />

2005. Hence for the purpose <strong>of</strong> analysis <strong>of</strong> distribution sector in Madhya Pradesh,<br />

consolidated data for MPSEB has been taken up to 2004-05. Thereafter individual<br />

DISCOMs wise data has been analysed from their respective ARR filings before<br />

MPERC.<br />

The overall snapshot <strong>of</strong> the distribution assets as also their individual energy<br />

requirement is as under:<br />

DISCOM wise details <strong>of</strong> HT and LT Lines (ckt km) in sub-T&D Network<br />

(ckt km)<br />

1998-99 1999-2000 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Poorv Kshetra<br />

HT Lines 64290 64888 65181 66179 68615 69957 69494<br />

LT Lines 97162 98890 99965 101338 104105 107101 107532<br />

Ratio LT/HT 1.51 1.52 1.53 1.53 1.52 1.53 1.55<br />

Madhya Kshetra<br />

HT Lines 57425 57941 58503 57736 61021 61465 62833<br />

LT Lines 91287 92201 93249 92417 96697 97221 98178<br />

Ratio LT/HT 1.59 1.591 1.594 1.601 1.585 1.582 1.56<br />

Paschim Kshetra<br />

HT Lines 56568 57415 57785 58300 59595 60476 61544<br />

LT Lines 123995 125514 126208 126651 130265 130740 131311<br />

Ratio LT/HT 2.19 2.186 2.184 2.172 2.186 2.162 2.134<br />

(Source: MPSEB Compendium)<br />

4.38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!