Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

up in tandem with Phase III tasks in order that specific outcomes are<br />

available along with the implementation plan in order that the latter can<br />

be out into operation smoothly.<br />

Additionally, key learnings from the experience <strong>of</strong> sector reform<br />

initiatives in other States have led to the formulation <strong>of</strong> a strategy based<br />

on a phased approach to deciding final structural configurations in order<br />

that transition issues can be adequately addressed with the support <strong>of</strong><br />

capacity building initiatives while initially, complying with the<br />

structural requirements <strong>of</strong> the EA, 2003. This strategy has also required<br />

State Government to seek to launch ‘capacity building’ initiatives for the<br />

successor/restructured Utilities at the commencement <strong>of</strong> the<br />

restructuring effort and to last over a three-year transition period. This<br />

will facilitate a gradual accretion <strong>of</strong> skill levels and capacity within the<br />

restructured Utilities to provide a stronger foundation to final<br />

determination <strong>of</strong> business structures.<br />

Q.6. Whether restructuring was done based on any consultants' report? If<br />

yes, enclose a copy.<br />

Answer - State Government’s restructuring initiatives in respect <strong>of</strong> its three power<br />

Utilities will be based on recommendations <strong>of</strong> pr<strong>of</strong>essional advisors.<br />

Their reports (for Phases I and II) are presently under presently<br />

consideration for appropriate approvals.<br />

Q.7. What, in your opinion, are the main drivers <strong>of</strong> power sector reforms (in<br />

order <strong>of</strong> priority) -<br />

Answer<br />

(a) Statutory requirement <strong>of</strong> segregation <strong>of</strong> transmission function from trading<br />

in integrated Utilities;<br />

(b) Build a strong foundation for sustainable commercial viability and higher<br />

levels <strong>of</strong> services; and<br />

(c) Empower power Utilities to raise resources on competitive terms for<br />

modernisation investments.<br />

Q.8. What, in your view are the desired outcomes and deliverables <strong>of</strong> the reforms? (In<br />

order <strong>of</strong> priority)<br />

125