Madhya Pradesh<br />

2. GENERATION<br />

2.1 MADHYA PRADESH POWER GENERATING COMPANY LIMITED<br />

(MPPGCL)<br />

MPPGCL is a public sector company wholly owned by Government <strong>of</strong> Madhya<br />

Pradesh with a current authorised capital <strong>of</strong> Rs 2,500 crore. The issued, subscribed<br />

and paid up capital is Rs 1,278 crore. Prior to 01June 2005, MPPGCL had been<br />

working under O&M agreement under MPSEB. However after the implementation <strong>of</strong><br />

the “Transfer Scheme Rules, 2003”, MPPGCL started working as an independent<br />

entity.<br />

2.2 GENERATING CAPACITY IN THE STATE<br />

2.2.1 Capacity before Restructuring<br />

The Madhya Pradesh Electricity Board (MPEB) had a capacity <strong>of</strong> about 4,260 MW in<br />

1999-2000. During the period 1995-96 to 1999-2000, the capacity addition was about<br />

447 MW.<br />

Total Generating Capacity (in MW) prior to Restructuring - State Sector<br />

Particulars 1995-96 1996-97 1997-98 1998-99 1999-2000<br />

Hydel 846.5 843.3 848.3 848.3 873.2<br />

Thermal 2967.5 2967.5 2967.5 3177.5 3387.5<br />

(Source: MPGENCO Schedule)<br />

After carving out the State <strong>of</strong> Chhattisgarh from the erstwhile Madhya Pradesh,<br />

MPSEB was formed, which has an installed generating capacity <strong>of</strong> about 2,940 MW<br />

only (2001-02).<br />

2.2.2 Generating Capacity after Restructuring<br />

Generating capacity in post-restructuring period up to 2004-05 in the State sector is<br />

given as under:<br />

Total Generating Capacity (in MW) Post-Restructuring--State Sector<br />

Particulars 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Hydel 753 793 843 843 843<br />

Thermal 2,147.5 2,147.5 2,147.5 2,147.5 2,147.5<br />

Total 2,900.5 2,940.5 2,990.5 2,990.5 2,990.5<br />

(Source: MPGENCO Schedule)<br />

4.25