Madhya Pradesh<br />

7. Electricity Act 2003 and the Reform Process<br />

The status <strong>of</strong> implementation <strong>of</strong> certain key provisions <strong>of</strong> the EA, 2003 in Madhya<br />

Pradesh is as under:<br />

Section 172<br />

Section 42(5)<br />

Section 55<br />

Section 135<br />

Separation <strong>of</strong><br />

transmission<br />

Utility<br />

Forum for<br />

redressal <strong>of</strong><br />

consumer<br />

grievance<br />

Supply <strong>of</strong><br />

electricity<br />

through<br />

metering<br />

Implementation<br />

<strong>of</strong> anti-theft<br />

measures<br />

MP <strong>Power</strong> Transmission Co. Ltd. (MPTRANSCO) was notified as<br />

State Transmission Utility (STU) on 17-05-2004. Vide Notification<br />

No. 3474/FRS/17/XIII/2002, dated 03-06-2006 the MP <strong>Power</strong> Trading<br />

Company Limited (TRADECo) has come in existence in the State and<br />

all the existing PPAs <strong>of</strong> MPSEB/MPPTCL shall be taken care <strong>of</strong> by<br />

the newly established TRADECO.<br />

As per directives <strong>of</strong> MPERC Electricity Consumer Grievances<br />

Redressal Forum has been formed in all three DISCOMs. Electricity<br />

Ombudsman has also been established<br />

MPERC under second proviso <strong>of</strong> Section 55(i) <strong>of</strong> EA, 2003 through<br />

Notification, dated 28.10.2005 has directed all the three DISCOMs to<br />

complete the work <strong>of</strong> metering <strong>of</strong> all the balance unmetered<br />

connection within the time limit.<br />

Officers nominated in all the three DISCOMs as Assessing Officers<br />

with powers to search and confiscate in cases <strong>of</strong> electricity theft under<br />

sections 126 and 135(2) <strong>of</strong> the EA, 2003.<br />

7.1 ESTABLISHMENT OF SLDC AND INTERCONNECTION WITH<br />

MPTRANSCO SYSTEM<br />

4.51<br />

(Source: MP Govt.)<br />

The State Government has constituted the existing load despatch centre as State Load<br />

Despatch Centre vide its Order dated 17 May 2004. The SLDC is the apex body<br />

responsible for the operation, planning, monitoring and control <strong>of</strong> the power system in<br />

the State. The SLDC is well connected with the western regional load despatch centre<br />

for efficient and integrated operation <strong>of</strong> the grid.<br />

7.2 ADEQUACY OF THE PROVISIONS OF THE CENTRAL ACT<br />

The State Government has stated that the Act seeks to create liberal framework for<br />

development <strong>of</strong> the power sector and strike a balance, which takes into account the<br />

complex ground realities <strong>of</strong> the power sector in the State. Timely and committed<br />

support from the Government and the established regulatory framework in the State<br />

are paving the way for the reforms to succeed.