04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rajasthan<br />

IMPROVEMENTS IN TECHNICAL PARAMETERS<br />

Kota Thermal <strong>Power</strong> Station<br />

Particulars<br />

1995<br />

-96<br />

1996<br />

-97<br />

1997<br />

-98<br />

1998<br />

-99<br />

1999<br />

-00<br />

2000<br />

-01<br />

2001<br />

-02<br />

2002<br />

-03<br />

2003<br />

-04<br />

PLF (%) 72.90 75.70 82.15 78.82 84.57 86.45 85.30 88.01 86.04<br />

Heat rate<br />

(kcal/kWh)<br />

2720 2728 2748 2790 2796<br />

Oil consumption<br />

(ml/KWh)<br />

3.83 2.52 1.69 1.30 0.96 0.68 0.63 0.43 0.39<br />

Auxiliary<br />

consumption (%)<br />

10.22 9.85 10.04 10.03 9.59 9.46 9.54 9.77 9.81<br />

Plant availability<br />

(%)<br />

Unscheduled<br />

76.54 78.54 85.41 81.36 86.01 86.77 85.97 89.02 90.36<br />

breakdowns in terms<br />

<strong>of</strong> MkWh<br />

237 505 177 163<br />

Suratgarh Thermal <strong>Power</strong> Station<br />

Particulars<br />

1998<br />

-99<br />

1999<br />

-00<br />

2000<br />

-01<br />

2001<br />

-02<br />

2002<br />

-03<br />

2003<br />

-04<br />

PLF (%) 71.24 74.44 80.24 85.04 88.94 80.74<br />

Heat rate (kcal/kWh) 2374 2448 2356 2505 2576 2429<br />

Oil consumption (ml/kWh) 9.45 4.35 2.74 1.56 1.07 0.98<br />

Auxiliary consumption (%) 10.45 10.265 9.26 9.31 9.18 9.37<br />

Plant availability (%) 79.16 83.43 86.19 87.66 91.62 84.78<br />

Investments Made to Improve Generation Capacity<br />

6.9<br />

(Rs crore)<br />

1995 1996 1997 1998 1999 2000 2001 2002 2003<br />

-96 -97 -98 -99 -00 -01 -02 -03 -04<br />

New capacity 397.75 401.90 537.73 581.93 562.37 826.78 855.45 859.82 255.4<br />

Renovation and<br />

modernisation<br />

0 0 0 0 0 2.98 0 0 6.26<br />

Main Drivers <strong>of</strong> <strong>Power</strong> Sector Reforms (in Order <strong>of</strong> Priority)<br />

1<br />

2<br />

3<br />

4<br />

Poor performance <strong>of</strong> SEBs in terms <strong>of</strong> high cost, inappropriate pricing, inadequate expansion,<br />

unreliable power supply, etc;<br />

Inability <strong>of</strong> the State sector to finance the needed expansion/modernisation;<br />

Desire to raise revenues for the Government through sale <strong>of</strong> assets (disinvestments; and.<br />

Need to remove subsidies to the sector in order to release State resources for other priorities.<br />

Desired Outcomes <strong>of</strong> The Reforms (in Order <strong>of</strong> Priority)<br />

1 More affordable access to electricity for consumers;<br />

2 Better service quality for consumers;<br />

3 Redefining the role <strong>of</strong> public sector; and<br />

4 Improvement in fiscal position <strong>of</strong> the Government

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!