04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Haryana<br />

OBSERVATIONS/COMMENTS<br />

1. HVPNL has shown consistency by maintaining the availability <strong>of</strong> its network<br />

and sub-stations. To further improve the reliability <strong>of</strong> the transmission network,<br />

the Commission may provide an incentive or disincentive scheme, based on the<br />

availability <strong>of</strong> the network, and may set benchmarks on similar lines as CERC’s<br />

guidelines for determination <strong>of</strong> tariff for Central Transmission Utility (CTU).<br />

2. The State should conduct requisite load flow studies to further improve the<br />

reliability and quality <strong>of</strong> power supply in the network. The network<br />

augmentation shall dwell upon ‘N-1’ reliability principles and the study so<br />

conducted shall serve as a pointer towards future network augmentation<br />

requirements to cater to the demand.<br />

2.29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!