3.3.2 Availability <strong>of</strong> Transmission Network<br />

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

There has been an increase in the transmission system availability from 97.59 per cent<br />

in 2000-01 to 99.53 per cent in 2003-04. The transmission system availability<br />

remained at 99.18 per cent in 2004-05. Appreciable level <strong>of</strong> transmission availability<br />

is also on account <strong>of</strong> very low failure rate <strong>of</strong> power transformers (about 3% during the<br />

period 1996-97 to 2002-03 and no failure was observed during the years 2003-04 and<br />

2004-05).<br />

100.0<br />

99.5<br />

99.0<br />

98.5<br />

98.0<br />

97.5<br />

97.0<br />

96.5<br />

97.59<br />

Availability <strong>of</strong> the Transmission Systems (%)<br />

98.2<br />

4.34<br />

98.75<br />

99.53<br />

99.18<br />

2000-01 2001-02 2002-03 2003-04 2004-05<br />

(Source: MPTRANSCO)<br />

3.4. CAPITAL INVESTMENTS IN THE TRANSMISSION SECTOR<br />

The investments in the transmission sector had picked up in 2003-04. The investment<br />

grew by almost 300 per cent to Rs 130 crore in 2003-04 from Rs 46.35 crore in 2000-<br />

01 for new transmission works and ten-fold for strengthening <strong>of</strong> transmission system<br />

from Rs 27 crore in 2001-02 to Rs 264 crore in 2004-05.<br />

Particulars<br />

New<br />

transmission<br />

works<br />

Investments in Transmission Sector: Post Restructuring<br />

1997<br />

-98<br />

1998<br />

-99<br />

1999-<br />

2000<br />

2000<br />

-01<br />

2001<br />

-02<br />

2002<br />

-03<br />

2003<br />

04<br />

(Rs crore)<br />

2004<br />

-05<br />

74.16 24.90 28.66 46.35 25.78 60.67 130.20 95.95<br />

Strengthening <strong>of</strong><br />

transmission<br />

system<br />

43.74 18.02 16.27 8.52 27.19 76.59 264.64 93.44<br />

Total 117.90 42.92 44.93 54.87 52.97 137.26 394.84 189.39<br />

(Source: MPTRANSCO)<br />

From the year 1998-99 to 2001-02 the level <strong>of</strong> investment made towards new capacity