04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

i) MERC has classified the consumers located in three regions namely urban and<br />

industrial conglomerates, other regions and agricultural dominated regions;<br />

ii) Each <strong>of</strong> the above regions is further classified into four groups A, B, C and D<br />

based on the level <strong>of</strong> T&D losses and collection efficiency in the area. A refers to<br />

the best and D refers to the worst; and<br />

iii) The apportionment <strong>of</strong> sheddable load between the above three regions is made in<br />

the ratio <strong>of</strong> 1:1.5:3.5, which results in following load shedding hours.<br />

Table: Load Shedding Plan as per MERC Order<br />

Group<br />

Urban and<br />

industrial conglomerates<br />

Other regions<br />

(Duration in hrs)<br />

Agricultural dominated<br />

regions<br />

A 2.5 4.5 11<br />

B 3 5 11.5<br />

C 3.5 5.5 12<br />

D 4 6 12<br />

The customers are made aware <strong>of</strong> the load shedding plan through advertisements in<br />

newspapers.<br />

Number <strong>of</strong> Unannounced Load Shedding and Duration<br />

In addition to the planned load shedding as above, there have been disruptions <strong>of</strong> a<br />

large nature due to instances <strong>of</strong> Grid failure. These details are noted as under:<br />

2002<br />

Table: Details <strong>of</strong> Grid Failure<br />

Grid failure event<br />

No. Date Cause From To Duration<br />

1 23 May 2002 Storm, tower collapse 8:54 17:57 9:03<br />

2 29 May 2002 Storm, tower collapse 2:09 9:00 6:51<br />

3 30 July 2002 Low frequency over drawl 20:11<br />

(31 July)<br />

19:49<br />

4 6 Oct. 2003 Bus fault- Kalwa S/S 10:37/11:24 14:00 3:23<br />

2003<br />

5<br />

6<br />

5 Nov. 2003<br />

7 Nov. 2003<br />

Low voltage<br />

Low voltage<br />

10:24/10:33<br />

13:03<br />

15:00<br />

16:00<br />

4:36<br />

2:57<br />

7 6 Dec. 2003 Low Voltage 12:21/12:38 15:00 2:39<br />

2004 8 5 Feb. 2004 Bus fault- Chandrapur S/S 14:16 17:48 3:32<br />

2005<br />

9 27 Feb. 2005 Fire at 400 kV Koradi S/S 19:18<br />

(28 Feb.)<br />

4:59<br />

9:41<br />

10 28 Feb. 2005<br />

<strong>Power</strong> swing due to<br />

occurrence at 400KV Satpura<br />

S/S<br />

Bus fault at 220 kV Padgha<br />

1:56<br />

(28 Feb.)<br />

4:59<br />

3:32<br />

11 21 Sept. 2005 S/S reduced 400 and 220 kV<br />

transmission network<br />

9:58 13:00 3:02<br />

10.42<br />

4:00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!