Gujarat<br />

Details <strong>of</strong> Arrears <strong>of</strong> Revenue and Debt<br />

Particulars 2000-01 2001-02 2002-03 2003-04 2004-05<br />

(Rs crore)<br />

2005-06<br />

Arrears <strong>of</strong> revenue 1901 1941 1953 2195 2417<br />

Debt (long-term) 7443 6312 8228 8920 9618 6943<br />

Financial Data<br />

Data on Turnover, PBT, PAT, Interest, etc.<br />

Particulars 2000-01 2001-02 2002-03 2003-04 2004-05<br />

(Rs crore)<br />

2005-06<br />

Turnover 6280 7274 7874 8545 9137<br />

PBT (2543) (622) (476) (1932) (927)<br />

PAT (2543) (622) (476) (1932) (927)<br />

Interest paid 1228 1017 772 1345 1211<br />

Wages and<br />

salaries<br />

723 735 746 777 869<br />

Equity 0 0 0 0 0<br />

Debt outstanding 7443 6312 8228 8920 9618<br />

Govt. subsidy 1505 1853 1876 1719 1578<br />

APRDP incentive - - 236 - - 148<br />

Investments made to Improve Distribution Capacities and Efficiencies<br />

(Rs crore)<br />

Particulars 2000-01 2001-02 2002-03 2003-04 2004-05<br />

ND Scheme 144.65 124.86 130.83 147.40 175.59<br />

System improvement 37.78 27.69 29.44 24.75 25.47<br />

Jyoti Gram Yojana 43.50 243.92<br />

Hamlet electrification 2.65 2.80 2.64<br />

Kutir Jyoti 2.51 2.63 2.50<br />

Scheme for meters 8.55 42.30 39.14 33.29<br />

APDRP Schemes<br />

In addition to the above, schemes for ten circles with investment cost <strong>of</strong> Rs 680.60<br />

crore were sanctioned under APDRP in the year 2002-03. Thereafter, in 2004-05,<br />

schemes for setting up <strong>of</strong> 15 Nos. <strong>of</strong> 66 kV sub-stations in six circles and<br />

SCADA/DMS system for Vadodara city at an estimated cost <strong>of</strong> Rs 63.97 crore were<br />

sanctioned under APDRP.<br />

Major works completed under these schemes are as under:<br />

• Replacement <strong>of</strong> 13.71 lakh single phase meters;<br />

• 48,505 electronic meters provided on LT industrial consumers;<br />

• 37,420 three phase meters provided on distribution transformers;<br />

9.31