Maharashtra<br />

Residual Life Assessment (RLA) Studies and Life Extension (LE) Works<br />

Earlier, MSEB had carried out RLA studies for some old units. Since LE works were<br />

not considered to be feasible in respect <strong>of</strong> the following units, tenders floated for these<br />

were cancelled.<br />

Bhusawal Unit-1 62.5 MW<br />

Paras Unit-2 58.0 MW<br />

Parli Unit-1&2 30.0 MW each<br />

Tenders for Koradi Units 1 and 2 (each <strong>of</strong> 120 MW) are in hand. It is, however, noted<br />

that the quoted rates are almost double as indicated in the estimates <strong>of</strong> CEA. Further<br />

the bidders are unwilling to guarantee the performance after carrying out the repairs.<br />

The pay back period <strong>of</strong> related works extends to around 11-12 years. In view <strong>of</strong><br />

uncertainty <strong>of</strong> sustained desired performance after LE works, MAHAGENCO are<br />

considering an alternative <strong>of</strong> using part <strong>of</strong> the auxiliary equipments <strong>of</strong> these old sets<br />

which can be still used with little repair expenses.<br />

MAHAGENCO is therefore, not likely to proceed further with the LE work in respect<br />

<strong>of</strong> these old units.<br />

Manpower<br />

Against a sanctioned strength <strong>of</strong> 17,436 posts, number <strong>of</strong> posts filled in is 14,001<br />

leaving over 3,435 posts vacant. Based on present installed capacity <strong>of</strong> 6,425 MW, the<br />

staff on the basis <strong>of</strong> sanctioned strength per MW works out to 2.71 and on actual posts<br />

filled, it works out to 2.18.<br />

Financial Health<br />

The Revenue Account for the period 6 June 2005 to 31 March 2006 (Provisional and<br />

unaudited), is given below:<br />

Table: Revenue Account<br />

(Rs crore)<br />

Particulars Gross Capitalised Net<br />

Revenue from sale <strong>of</strong> power 5445.27 5445.27<br />

Subsidies and grants 00 00<br />

Other income 43.71 43.71<br />

Total revenue (R) 5488.98 5488.98<br />

Expenditure<br />

Generation <strong>of</strong> power 4393.91 4343.91<br />

Repairs and maintenance 320.98 0.87 320.11<br />

Employee cost (excluding gratuity) 306.45 14.78 291.67<br />

Gratuity 46.94 46.94<br />

<strong>Administration</strong> and general expenses 31.28 17.51 13.77<br />

Depreciation 317.98 0.24 317.74<br />