State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

MPSEB/MPPTCL shall be taken care <strong>of</strong> by the newly established power trading<br />

company. The MP Tradeco has been established on 03 June 2006 with its<br />

Headquarters at Jabalpur.<br />

3.1 TRANSMISSION NETWORK<br />

Following is an overall snapshot <strong>of</strong> the transmission network <strong>of</strong> MPSEB:<br />

Growth <strong>of</strong> Transmission Sector in Madhya Pradesh<br />

Particulars 1998-99 1999-2000 2000-01 2001-02 2002-03 2003-04<br />

Length <strong>of</strong> Lines (ckt km)<br />

400 kV 1,751 1,982 1,706 1,706 1,706 1,723<br />

220 kV 8,079 8,086 6,296 6,496 6,496 6,594<br />

Sub-stations/Transformers<br />

400 kV<br />

Sub-stations (No.) 5 5 4 4 4 4<br />

Transformers (No.) 22 22 14 14 14 14<br />

Capacity (MVA) 3,990 3,990 2,940 2,940 2,940 2,940<br />

220 kV<br />

Sub-stations (No.) 29 29 26 26 26 28<br />

Transformers (No.) 86 87 75 74 75 78<br />

Capacity (MVA) 7,580 7,740 6,650 6,610 6,770 7,250<br />

(Source: MPSEB Compendium)<br />

MPPTCL has accorded priority to strengthening <strong>of</strong> the T&D system in order to reduce<br />

T&D losses and to provide quality and reliable power to consumers and hence, post-<br />

2002, works <strong>of</strong> more than Rs 1,200 crore have been implemented and other proposals<br />

are being put up for financial assistance.<br />

Particulars<br />

Growth <strong>of</strong> Transmission System in MPPTCL<br />

As on 1.07.02<br />

(beginning <strong>of</strong><br />

company)<br />

4.32<br />

As on<br />

March 2005<br />

As on<br />

April 2006<br />

% Increase in<br />

TR Capacity<br />

over 1-7-2002<br />

Length <strong>of</strong> lines (ckt km) 17,432 19,310 19,871 10.77<br />

Sub-stations (No)* 141 177 185 25.53<br />

Transformers (No)* 364 430 443 18.13<br />

Capacity (MVA)* 16,680 21,812 23,175 30.77<br />

* includes 132 and 66 kV assets (Source: M TRANSCO)