State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

independently. Therefore the actual performance evaluation <strong>of</strong> the DISCOMs in<br />

respect <strong>of</strong> their operation as independent corporate entities can be done only after<br />

certain period <strong>of</strong> time. MPERC in its tariff order dated 31 March 2006, which is the<br />

first Annual Revenue Requirement (ARR) for determination <strong>of</strong> tariff in respect <strong>of</strong><br />

these DISCOMs for 2006-07 has stipulated the following programme for AT&C loss<br />

reduction:<br />

DISCOM<br />

Prescribed by the Commission<br />

Indicated by the<br />

respective DISCOM<br />

2005-06 2006-07 2007-08 2008-09 2005-06 2006-07<br />

Poorv Kshetra 35.5 32.5 29.5 26.5 38.73 35.88<br />

Paschim Kshetra 31.7 30 27.5 25 31.5 30<br />

Madhya Kshetra 41.6 37 32 27.5 41.6 38<br />

Source: MPERC<br />

The target level regarding AT&C losses for 2005-06, as prescribed by MPERC, has<br />

been achieved by Paschim Kshetra and Madhya Kshetra DISCOMs, whereas the same<br />

has not been achieved by the Poorv Kshetra DISCOM (the gap <strong>of</strong> 3.23 per cent is yet<br />

to be met).<br />

For checking and prevention <strong>of</strong> theft <strong>of</strong> electricity, Madhya Pradesh Urja Adhiniyam<br />

was notified by the State Government on 17 April, 2001. Several administrative<br />

measures have been undertaken by the DISCOMs to check electricity theft These<br />

include strengthening <strong>of</strong> the Vigilance Squads, replacing bare low tension (LT)<br />

conductors by armored cables/HT lines, setting up <strong>of</strong> special courts for speedy trial <strong>of</strong><br />

electricity theft cases (92 special courts have been set up so far).<br />

4.1.2.4 Multi Year Tariff Framework<br />

MPERC has introduced Multi Year Tariff (MYT) framework under which a loss<br />

reduction trajectory and other targets <strong>of</strong> expenditure, etc., are fixed for the control<br />

period.<br />

MPERC directed that the first control period for MYT will run for a period <strong>of</strong> three<br />

years, i.e., up to 2008-09 for all the five companies. The tariff determined under its<br />

tariff order for 2006-07, under the present order, shall be the tariff and charges<br />

recoverable from various consumer categories during the control period. MPERC will<br />

review the actual performance <strong>of</strong> the targets <strong>of</strong> efficiency and conduct truing up <strong>of</strong><br />

cost through Annual Revenue Requirement (ARR) for each year. The distribution<br />

licensees are required to file their ARR application before the Commission every year<br />

by 31 October.<br />