04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

levels, coupled with the high level <strong>of</strong> T&D losses is pushing the State power<br />

sector into a severe financial crisis, so much so, that the companies are unable<br />

to pay for adequate power purchased from Central Utilities and State<br />

generation entities. This, in turn, is leading to financial un-viability <strong>of</strong> the<br />

generation sector as well. Hence, the State Government needs to institute<br />

requisite mechanisms to ensure timely settlement <strong>of</strong> these dues.<br />

Augmentation <strong>of</strong> Supply: The State is facing a severe supply shortage. The<br />

quality <strong>of</strong> supply throughout the State is extremely erratic and pitiful. The poor<br />

supply situation is adversely affecting industrial and commercial growth in the<br />

State, and in turn, hampering economic development <strong>of</strong> the State. The State<br />

needs to augment its generation capacity urgently, to improve the supply<br />

position. This is even more vital in view <strong>of</strong> the State taking considerable<br />

initiatives in creating a rural distribution infrastructure under the RGGVY. The<br />

benefits <strong>of</strong> investments made under the RGGVY would not be visible until<br />

there is adequate power in the system to cater to the increased demand in the<br />

State from the newly electrified rural areas. PPA in respect <strong>of</strong> 1,000 MW<br />

Anpara-C Expansion Project has recently been signed with M/s LANCO<br />

<strong>Power</strong>. There are also talks <strong>of</strong> considerable capacity creation by M/s Reliance<br />

Energy Limited in the State. The State needs to ensure that such capacity<br />

creation gets <strong>of</strong>f the ground at the earliest possible to meet the National plan<br />

target <strong>of</strong> power for all by 2012.<br />

88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!