04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

National <strong>Report</strong> (Vol.-II)<br />

Study on ‘Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

7.3.5 Prepare a programme for increased civil society participation in the areas <strong>of</strong><br />

consumer interest, on the lines <strong>of</strong> Akshay Prakash Yojana (APY) in<br />

Maharashtra and Grama Vidyuth Pratinidhi (GVP) in Karnataka and other<br />

appropriate models. [Para 6.17]<br />

7.3.6 Establish Citizens’ Charters in all <strong>of</strong>fices and divisions as mandated by the<br />

Department <strong>of</strong> Administrative Reforms and <strong>Public</strong> Grievances, Government <strong>of</strong><br />

India, and take action to implement them earnestly, in cooperation with<br />

consumer advocacy groups. [Para 6.18]<br />

7.3.7 Ensure that the Universal Metering Programme is accorded top priority. Also<br />

ensure that meters are checked regularly and defective meters replaced<br />

promptly. [Para 6.19]<br />

7.3.8 Pursue with the concerned State Government to secure its full support and<br />

cooperation to detect and prevent electricity thefts; follow up regarding<br />

establishment <strong>of</strong> special courts, special police stations and prosecutors, etc., by<br />

regular interaction. [Para 6.20]<br />

7.3.9 Strengthen energy audit by providing precision meters <strong>of</strong> the prescribed<br />

accuracy, feeder meters, and installing adequate checks, in accordance with the<br />

set guidelines. [Para 6.21]<br />

7.3.10 Establish fair and transparent outsourcing strategy for each company, (after<br />

taking the staff representatives into confidence), by identifying suitable<br />

functions, aimed at achieving better efficiency and customer satisfaction with<br />

proper checks and balances. [Para 6.26]<br />

7.3.11 Foster the application <strong>of</strong> feasible IT solutions, such as consumer indexing,<br />

AMR, GIS, DAS, etc., in the power systems. [These should be validated by the<br />

Regulatory Commissions/independent agencies and should be made a<br />

prerequisite for decision-making on Annual Revenue Requirements (ARR)<br />

filed by the Utilities before the appropriate Commission]. [Para 6.25.2]<br />

7.3.12 Accord high priority for rural electrification in the business plan, and also<br />

include the targets in the MoAs to be signed with the Department <strong>of</strong><br />

Energy/<strong>Power</strong>. Undertake plans to provide separate 11 kV feeders for rural<br />

domestic and agricultural supplies, to facilitate better load management and<br />

improved recovery. [Para 6.28]<br />

32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!