Haryana<br />

Table: Availability <strong>of</strong> Transmission Sub-stations <strong>of</strong> HVPNL (%)<br />

Name <strong>of</strong> Substation<br />

220 kV Narnaul<br />

220 kV Hisar<br />

220 kV Rewari<br />

132 kV S/S Dadri-II<br />

132 kV Hansi (Hisar end)<br />

132 kV Hansi (Bhiwani end)<br />

132 kV Karnal<br />

66 kV Daruhera<br />

66 kV Gobindpuri (Y/Nagar)<br />

Planned Maintenance<br />

2001<br />

94.94<br />

92.62<br />

96.64<br />

96.43<br />

96.66<br />

99.39<br />

98.90<br />

72.76<br />

78.72<br />

2.21<br />

2002<br />

100.00<br />

98.00<br />

91.81<br />

99.85<br />

100.00<br />

99.40<br />

100.00<br />

88.98<br />

98.80<br />

2003<br />

100.00<br />

84.00<br />

100.00<br />

100.00<br />

100.00<br />

99.55<br />

99.40<br />

87.35<br />

100.00<br />

2004<br />

100.00<br />

95.00<br />

100.00<br />

100.00<br />

100.00<br />

100.00<br />

99.70<br />

83.00<br />

100.00<br />

2005<br />

100.00<br />

100.00<br />

100.00<br />

100.00<br />

100.00<br />

100.00<br />

100.00<br />

77.83<br />

100.00<br />

HVPNL has saved outage hours through planned maintenance schedule and through<br />

hot-line maintenance to improve the reliability <strong>of</strong> power. The following table indicates<br />

significant saving in outages to the extent <strong>of</strong> about 466 hours on 220 kV lines on<br />

account <strong>of</strong> hotline maintenance carried out by the utility staff. Time period <strong>of</strong> around<br />

9,000 hours <strong>of</strong> planned maintenance was carried out which enhanced the reliability <strong>of</strong><br />

power in the State.<br />

Table: Planned Maintenance and Savings due to Hotline Maintenance<br />

Activity 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05<br />

No. <strong>of</strong> hours <strong>of</strong> outage saved due to hotline maintenance<br />

· 220 KV 117 220.3 114 197 79 69 466<br />

· 132 KV 257 255.3 94 335 151 86 197<br />

· 66 KV 752 241.3 210 194 330 521 532<br />

Total<br />

Average hours taken for planned maintenance<br />

1126 716.9 418 726 560 676 1195<br />

Total time <strong>of</strong> outage (Hours) 4760 15574 4961 6015 4999 10209 9196<br />

The average availability <strong>of</strong> various sub-stations depicts an overall improvement as<br />

shown in the chart below. The average interruption time owing to faults in the<br />

transmission lines has reduced significantly by about 50 per cent i.e., from 3,397<br />

hours in 2002-03 to about 1,582 hours in 2004-05.