Directives Issued by the Commission<br />

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

The Commission has provided the following key directives to the DISCOMs to<br />

effectively implement the reform process. A summary <strong>of</strong> the same has been provided<br />

below:<br />

Receivables<br />

Financial<br />

Management<br />

• All receivables accounts shall be computerised and detailed audit <strong>of</strong><br />

receivables shall be undertaken; so that precise amount <strong>of</strong> consumer-wise<br />

position with age-wise break-up separately for sale <strong>of</strong> power, delayed<br />

payment surcharge, municipal tax and electricity duty with current and<br />

old arrears may be known.<br />

• To submit a report giving details <strong>of</strong> the action taken in each case to<br />

recover arrears from the consumers having arrear above Rs 1 lakh.<br />

(Directions given in 11.8.2001 and 20.8.2003 orders)<br />

• To physical verify all the fixed assets, particularly the fixed assets created<br />

out <strong>of</strong> the consumers’ contribution. (Direction given in 16.8.2002 order)<br />

• To reconcile the inter-company accounts between the transmission,<br />

distribution and generation companies. (Direction given in 16.8.2002<br />

order)<br />

Metering • The Commission directed the D&RS licensee to submit detailed metering<br />

plan for 100 per cent metering in the State. (Direction given on<br />

16.8.2002)<br />

• The Commission further directed that 100 per cent metering be<br />

completed by June 2005 as per Section 55 <strong>of</strong> the EA, 2003. (Direction<br />

given on 29.1.2004)<br />

• Besides consumers’ metering, the licensee should also complete 100 per<br />

cent metering at feeders and distribution transformers for energy audit<br />

purpose.<br />

• To put MDI meters at unmetered agriculture pump-set consumers.<br />

Performance<br />

improvement<br />

Technical<br />

issues<br />

(Direction given in 16.8.2002 order)<br />

• To investigate the causes <strong>of</strong> high damage rate <strong>of</strong> distribution<br />

transformers. To submit separate data for urban and rural areas.<br />

(Direction given in 20.8.2003 and 18.4.2005 orders)<br />

• To carry out load survey for the consumers who pay on MMC basis or on<br />

average basis for a long time. (Direction given in 11.8.2001 order)<br />

• To establish the computerised State-<strong>of</strong>-the-Art Area Load Dispatch<br />

Centre.<br />

• To undertake activity <strong>of</strong> consumer indexing and Geographical<br />

Information Systems (GIS) mapping. (Direction given in 18.4.2005<br />

order)<br />

2.48