Andhra Pradesh<br />

It can be seen that the major capacity additions <strong>of</strong> 1,686 MW had come from<br />

the central sector, <strong>of</strong> which 1,000 MW was from the State dedicated Simhadri<br />

<strong>Power</strong> Station <strong>of</strong> NTPC, located at Vishakapatnam. Private sector contribution<br />

was only 575 MW in six years. The following major power stations, planned<br />

under the private sector, did not materialise for want <strong>of</strong> financial closures:<br />

• 1000 MW <strong>Power</strong> Station at Vishakapatnam by M/s Hindujas.<br />

• 1000 MW <strong>Power</strong> Station at Krishna Patnam by M/s GVK <strong>Power</strong> and BBI.<br />

• 500 MW <strong>Power</strong> Station at Ramagundam by M/s BPL.<br />

After restructuring, APGENCO’s major contribution was the 900 MW<br />

Srisailam Left Bank Hydel Station (6x150 MW). The balance sheets <strong>of</strong> the<br />

State Utilities has inspired enough confidence in the FIs to provide financial<br />

support for the projects <strong>of</strong> APGENCO. The following projects <strong>of</strong> APGENCO<br />

are under various stages <strong>of</strong> execution:<br />

Project Capacity<br />

Schedule <strong>of</strong><br />

Completion<br />

RTPP-II Stage 2 x 210 MW 2006-07<br />

VTPS-IV Stage 1 x 500 MW 2008-09<br />

KTPS-VI Stage 1 x 500 MW 2009-10<br />

Bhupalapalli Thermal Station 1 x 500 MW 2008-09<br />

Jurala Hydel Station<br />

1 x 39 MW<br />

5 x 39 MW<br />

2006-07<br />

2008-09<br />

Nagarjunasagar Tailpond Hydel Station 2 x 25 MW 2008-09<br />

Pochampad Hydel Station Unit-4 1 x 9 MW 2008-09<br />

Total 2,213 MW<br />

The following gas-based power plants, under the private sector, are expected to<br />

be commissioned soon:<br />

GVK Extension I 220 MW<br />

Vemagiri Stage I 370 MW<br />

Gouthami Stage I 464 MW<br />

Konaseema 445 MW<br />

Overall, there is satisfactory progress in capacity additions after reform and<br />

restructuring <strong>of</strong> the power sector.<br />

1.28