Maharashtra<br />

MSEDCL over the period 2000-01 to 2005-06 is two per cent. The company had a<br />

turnover <strong>of</strong> Rs 15,072 crore in 2005-06.<br />

The distribution network comprises <strong>of</strong> 2,15,321 ckt km <strong>of</strong> HV lines <strong>of</strong> 33/22/11 kV<br />

and 4,61,793 ckt km <strong>of</strong> LT lines, 2,20,799 DTs having 22,154 MVA capacity and<br />

16,980 MVA <strong>of</strong> 33 kV transformation capacity as given below:<br />

Table: Distribution Network Related Information<br />

Item 2003-04 2004-05 2005-06 Remarks<br />

Total number <strong>of</strong> DTCs 205542 212272 220799<br />

Number <strong>of</strong> DTCs failed 31422 30133 39352<br />

DTCs failure rate (%) 14.67 18.52 15.58<br />

33 kV transformers capacity (MVA) 16280.45 16570.1 16980.3<br />

DTs capacity (MVA) 18967.9 20879.3 22153.646<br />

33 kV, 22 kV, 11kV lines (ckt km) 208726.95 212087.27 215321.016<br />

LT Lines Commissioned (ckt km) 444618 452809.51 461792.84<br />

33 kV, 22 kV, 11 kV lines (ckt km) 26150.52 26541.91 27088.856<br />

22 kV, 11 kV lines commissioned. (ckt<br />

km)<br />

21424.61 21733.77 21978.629<br />

11 kV lines commissioned. (ckt kms) 161151.82 163811.59 166253.531<br />

Extent <strong>of</strong> Load Shedding<br />

10.41<br />

2005-06<br />

data upto<br />

February<br />

2006.<br />

At the<br />

beginning<br />

<strong>of</strong> the year.<br />

Due to inadequate generating capacity to meet the demand, MSEDCL is forced to<br />

resort to load shedding and the extent <strong>of</strong> load shedding is given below:<br />

Table: Details <strong>of</strong> Load Shedding*<br />

2000-01 2001-02 2002-03 2003-04 2004-05<br />

(Maximum in MW)<br />

2005-06<br />

1,822 1,016 2,421 2,042 3,045 4,539<br />

* as on 22 December 2005<br />

MSEDCL has categorised total load in non-sheddable load <strong>of</strong> (3,554 MW),<br />

comprising <strong>of</strong> EHV feeders, feeders for Maharashtra State Industrial Development<br />

Corporation (MIDC) areas, express-feeders for industries, municipal water works and<br />

utility, and remaining as sheddable load <strong>of</strong> 8,730 MW <strong>of</strong> the total <strong>of</strong> 12,284 MW.<br />

Load shedding is done in accordance with a plan ordered by MERC. The salient<br />

features <strong>of</strong> this novel load shedding plan approved by MERC are noted as under: