State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

company will be encouraged to operate independently and can be held fully<br />

accountable for its performance. The initiative to maintain some distance from<br />

the different companies has to originate from GUVNL.<br />

Introduction <strong>of</strong> Intra-State ABT<br />

Introduction <strong>of</strong> intra-State ABT will surely lead to discipline in operation <strong>of</strong> all<br />

utilities. Till the time utilities get used to operate in strict regime <strong>of</strong> ABT, there will be<br />

instances <strong>of</strong> Unscheduled Interchanges (UI) and payment <strong>of</strong> penalties there<strong>of</strong>. In order<br />

that the sole objective <strong>of</strong> avoiding UI and associated payment <strong>of</strong> penalties does not<br />

override and obscure the vision <strong>of</strong> the utilities <strong>of</strong> providing continuous supply as an<br />

important parameter <strong>of</strong> their operations, some guidelines will need to be discussed and<br />

finalised for operation in the interim period.<br />

Another aspect that needs to be addressed is the simplification <strong>of</strong> operation <strong>of</strong> ABT.<br />

Presently, a large number <strong>of</strong> interchange points have been identified for fixing meters.<br />

This may partly be due to 66 kV lines running across more than one DISCOM’s area.<br />

In the next few years, efforts should be made so that 66 kV lines do not form any<br />

interconnection between different DISCOMs and such interconnections are only at<br />

higher voltage levels. 66 kV network in a DISCOM’s area should remain exclusively<br />

for serving loads only in that company’s area. Reduction <strong>of</strong> number <strong>of</strong> interconnection<br />

points will help in simplifying the ABT operation.<br />

CAPITAL INFUSION BY GOVERNMENT OF GUJARAT/PROFITABLE<br />

STATE PSUs<br />

In the FRP, every year an amount <strong>of</strong> about Rs 600 crore is proposed to be provided by<br />

Government <strong>of</strong> Gujarat/pr<strong>of</strong>itable PSUs <strong>of</strong> the State, towards capital infusion in<br />

restructured companies. This amount is in addition to Rs 250 crore per year <strong>of</strong> grant<br />

from the State Government. Since Government <strong>of</strong> Gujarat has other commitments like<br />

providing RE subsidy, etc.; most <strong>of</strong> this additional capital infusion may ultimately<br />

have to come from the identified State PSUs.<br />

The terms <strong>of</strong> such capital infusion or the identification <strong>of</strong> the PSUs is not yet known.<br />

During discussions, it was mentioned that various options such as direct equity<br />

support, equity support for specific projects, etc., are being considered. With no core<br />

competence in the energy sector available with them, PSUs may not be comfortable to<br />

be equity participants <strong>of</strong> such a large magnitude. GUVNL could check if some form<br />

<strong>of</strong> revenue sharing arrangement could be favoured by these PSUs.<br />

9.20