State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

Table: List <strong>of</strong> IPPs who have given their Expression <strong>of</strong> interest<br />

IPP showing<br />

expression <strong>of</strong> interest<br />

M/s Jindal Stainless<br />

Ltd., Hissar<br />

M/s Weizmann Private<br />

Ltd., Mumbai<br />

M/s Tayal Energy,<br />

Silvassa<br />

M/s Tata <strong>Power</strong><br />

Company / NDPL<br />

M/s Aban Lloyd<br />

Chilies Offshore Ltd.,<br />

Chennai<br />

M/s Torrent Private<br />

Ltd., Ahmedabad<br />

Proposed sites<br />

in Haryana<br />

Capacity<br />

proposed by IPP<br />

(MW)<br />

2.12<br />

MOA signed<br />

with GAIL<br />

on<br />

Hissar 1080 06.09.2005<br />

Panipat 600 16.09.2005<br />

Panipat 400 14.10.2005<br />

Jhajjar 1000 17.11.2005<br />

Faridabad<br />

1065<br />

03.05.2005<br />

Panipat 370 -<br />

Implement-<br />

ation<br />

schedule<br />

Not firmed up,<br />

as availability<br />

<strong>of</strong> gas is<br />

uncertain.<br />

(Source: HVPNL)<br />

However, owing to the uncertainty in availability <strong>of</strong> gas, their schedule <strong>of</strong><br />

implementation has not been firmed up and the State Government has not entered into<br />

any MoU/ PPA with the above IPPs.<br />

RENOVATION AND MODERNISATION OF EXISTING PLANTS<br />

In its submission to the Commission, HPGCL has mentioned that the R&M work <strong>of</strong><br />

Unit-I <strong>of</strong> Panipat Thermal <strong>Power</strong> Station has already been awarded to M/s BHEL and<br />

it is likely to be completed by March 2007. The R&M <strong>of</strong> Unit–II has been completed<br />

and the unit is performing satisfactorily. The scope <strong>of</strong> work for R&M for Units-III and<br />

IV has also been finalised.<br />

For the Eleventh Plan period, HPGCL has kept a total outlay <strong>of</strong> around Rs 375 crore<br />

to be spent on renovation and modernisation <strong>of</strong> the existing plants. Further<br />

apportionment <strong>of</strong> the investment outlay for specific units was not provided.<br />

PERFORMANCE OF THE STATE GENERATION UNITS<br />

Technical Parameters<br />

Plant Load Factor<br />

HPGCL has made a marked improvement in its overall performance. The gross<br />

generation has increased from 3,783 MU at the time <strong>of</strong> restructuring in 1998-99 to<br />

6,784 MU in 2004-05. Apart from addition in generating capacity, there is a<br />

substantial improvement in the Plant Load Factor (PLF) <strong>of</strong> the stations. Prior to