Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

In 2004-05, the energy available for transmission was 3,431 MU and that<br />

delivered was and 3,137 MU. These figures represent the best performance in<br />

terms <strong>of</strong> energy handled over the years. Investments <strong>of</strong> Rs 36.43 crore (2004-<br />

05) and Rs 70.38 crore (2005-06) were, made in strengthening the transmission<br />

system. These were substantially higher than those made in any <strong>of</strong> the past<br />

years. An amount <strong>of</strong> Rs 171.55 crore has been utilised under APDRP.<br />

However, there has not been any noticeable impact on reduction <strong>of</strong> AT&C<br />

losses. For the financial commitments made in FRP, Government <strong>of</strong> Assam has<br />

made the following payments/provision:<br />

Year<br />

Commitments Made in FRP<br />

Amount<br />

2003-04 Rs 141 crore (against defaulted bonds)<br />

2004-05 Rs 529 crore<br />

2005-06 Rs 372.62 crore (provision made)<br />

AERC has issued four tariff orders up to 2005-06. Modest increases have been<br />

allowed in tariffs. The Commission has been functioning independently<br />

without any interference. The companies have filed petitions for 2006-07 but<br />

the decision was held back because <strong>of</strong> the State Assembly Elections. MYT is<br />

being considered. The Commission has notified 16 Regulations under the EA,<br />

2003.<br />

Most <strong>of</strong> the <strong>of</strong>ficers and staff in the Commission are on deputation from ASEB.<br />

About 1.6 lakh BPL category consumers have been given subsidy. Crosssubsidy<br />

still exists. AERC has come out with regulations allowing Open<br />

Access in distribution system to be completed in a phased manner. ABT is yet<br />

to be introduced.<br />

8.4 SPECIAL FEATURES OF THE REFORM PROCESS<br />

Assam was the first State, in which the Electricity Board was restructured after<br />

the enactment <strong>of</strong> the EA, 2003 in June 2003. A lot <strong>of</strong> preparatory work had<br />

been done by analysing the problem <strong>of</strong> the State’s power sector and<br />

announcing a power policy on Reforms and Restructuring in January 2003. A<br />

clear road map was laid out in the policy. Financial assistance <strong>of</strong> US$ 250<br />

million from the ADB became a key factor in clearing up the books <strong>of</strong> ASEB<br />

and starting the new companies. Consultants, appointed from the special<br />

financial assistance <strong>of</strong> ADB, helped in designing the financial projections <strong>of</strong><br />

the new companies and preparing the opening balance sheets. M/S P.A.<br />