Haryana<br />

ROLE OF STATE GOVERNMENT<br />

The State Government is fully committed to implement the provisions <strong>of</strong> the EA, 2003<br />

in respect <strong>of</strong> electricity pricing, subsidy, promotion <strong>of</strong> Open Access in the<br />

transmission and distribution sectors and enforcement <strong>of</strong> the anti-theft provisions.<br />

MOU AND THE ACHIEVEMENTS<br />

The activity-wise status <strong>of</strong> the MoU/MoA and the implementation status have been<br />

presented below:<br />

Sl.<br />

No.<br />

Type <strong>of</strong> Activity<br />

Target/<br />

Schedule<br />

Date<br />

2.49<br />

Actual date/ Status <strong>of</strong> implementation<br />

Reform Programme<br />

1 Electricity Reforms Act 1997<br />

2 Formation <strong>of</strong> State Electricity<br />

Regulatory Commission<br />

16 August 98<br />

3. Restructuring <strong>of</strong> State Electricity<br />

HPGCL and HPVNL and subsequently<br />

Board<br />

UHBVN & DHBVN.<br />

4. Energy Audit at all levels Being followed<br />

5. 100 per cent metering <strong>of</strong> all 31.12.2001 All consumer connections are metered<br />

consumer<br />

(except some <strong>of</strong> the agriculture category<br />

consumers)<br />

6. Installation <strong>of</strong> meters at 11 kV 31.03.2001 Metering is being done through existing<br />

feeders<br />

electro-mechanical and electronic meters.<br />

7. Formation <strong>of</strong> distinct distribution 31.03.2002 In UHBVN, the matter regarding formation<br />

pr<strong>of</strong>it centres at divisional level<br />

<strong>of</strong> separate pr<strong>of</strong>it centres at Divisional<br />

and preparation <strong>of</strong> separate<br />

commercial accounts balance<br />

sheets for such centres<br />

levels is under consideration.<br />

8. T&D losses reduction to 20 per 2006 2001-02 = 31.24<br />

cent<br />

2001-03 = 35.66<br />

(Input energy- Billed energy)<br />

2002-03 = 35.02<br />

Input energy<br />

2003-05 = 32.36<br />

2004-05 = 30.53<br />

Steps are being taken to reduce the T&D<br />

losses through extensive checking’s,<br />

9 Computerised Billing at all major<br />

replacement <strong>of</strong> electro-mechanical meters<br />

with electronic meters and by bi-trifurcation<br />

<strong>of</strong> 11 kV overloaded feeders.<br />

Computerised billing for HT industrial / DS<br />

towns<br />

and NDS consumers is already being done.<br />

A computerised billing centre has been<br />

established at Panchkula. Initially,<br />

computerised billing will be done for all LT<br />

industrial consumers under UHBVN.