Gujarat<br />

Investments Made to Improve Transmission Capacity<br />

(Rs crore)<br />

Particulars<br />

New transmission lines<br />

2002-03 2003-04 2004-05 2005-06<br />

Strengthening <strong>of</strong><br />

180.46 145.49 147.84 352.54<br />

transmission system<br />

* The segregation <strong>of</strong> the investments for new transmission lines and strengthening <strong>of</strong><br />

transmission system is not available.<br />

It is seen from the above that the transmission loss is low and the availability <strong>of</strong> the<br />

transmission system is higher than norms. GETCL is understood to have formulated a<br />

long-term business plan.<br />

The total staff working in GETCL is 10,643. Therefore, MU handled per employee<br />

per annum comes to 4.98.<br />

GETCL had submitted ARR in January 2006 and GERC has issued its orders on this<br />

submission in May 2006. For 2006-07, transmission charge/MW/month approved by<br />

the Commission works out to Rs 86,142 in place <strong>of</strong> GETCO’s request <strong>of</strong> Rs 1,03,539.<br />

These charges include return on equity amounts <strong>of</strong> Rs 196 crore in place <strong>of</strong> Rs 280.88<br />

crore claimed by GETCO.<br />

Way Forward<br />

GETCL needs to look in the following issues and take suitable action:<br />

1. Conversion <strong>of</strong> a single 66 kV meshed network for the entire State into four<br />

meshed networks, one each for the individual DISCOM’s area.<br />

2. Providing precision energy meters and high accuracy instrument transformers in<br />

generator transformer bays in EHV sub-stations for measurement <strong>of</strong> energy<br />

delivered on the busbar wherever presently such provisions do not exist.<br />

DGVCL/MGVCL/PGVCL/UGVCL Distribution Companies in Gujarat<br />

Preamble<br />

The distribution sector <strong>of</strong> erstwhile GEB was restructured into four independent<br />

DISCOMs w.e.f. 1 April 2005. Gujarat’s reply to IIPA’s questionnaire primarily<br />

contains data prior to restructuring. Information pertaining to individual companies<br />

after restructuring for the year 2005-06 is not yet compiled though the companies have<br />

taken actions in terms <strong>of</strong> formulating individual business plans and have identified<br />

investments required for capacity additions and improvements over a long term<br />

period. However actions for improvement <strong>of</strong> the distribution sector have been initiated<br />